# 1400 Pelham Parkway South, The Bronx

Hospital · built 1957 · Block 4205, Lot 1.

On Umarelli: https://umarelli.org/nyc/2042050001/1400-pelham-parkway-south

More construction in Pelham Parkway: https://umarelli.org/nyc/bronx/pelham-parkway.md

## Building permits

- Alteration, filed Mar 26, 2026, estimated cost $10K, described as “Installation of debris chute at 1400 pelham parkway south, bronx as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Aug 12, 2025, described as “Suspended scaffold outrigger system for material hoist for the restoration work at 1400 pelham parkway south, bronx, ny 10461.”
- Alteration, filed Jun 11, 2025, estimated cost $21K, described as “Excavate and install a 26'-0" x 16'-0" x 12'-2" deep interlocking steel sheet pile and steel waler support of excavation system to facilitate the required underground fuel storage tank replacement on site”
- Alteration, filed May 30, 2025, estimated cost $5K, described as “Installation of a temporarily supported scaffold and construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Apr 28, 2025, described as “Suspended scaffold outrigger system at 1400 pelham parkway south, bronx for facade restoration work with inspections. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Feb 12, 2025, estimated cost $870K, described as “Installation of stormwater management system (subsurface detention tanks) per dep private property green infrastructure retrofit incentive program. No change to use, egress, or occupancy.”
- Alteration, filed Feb 5, 2025, estimated cost $150K, described as “Addition to the existing hyperbaric chamber. No change in use, egress or occupancy”
- Alteration, filed Feb 5, 2025, estimated cost $1.3M, described as “General construction involving interior renovation as shown herewith. No changes to egress, occupancy or use.”
- Alteration, filed Jan 9, 2025, estimated cost $500K, described as “Installation of stormwater management system (subsurface infiltration tanks) per dep private property green infrastructure retrofit incentive program. No change to use, egress, or occupancy.”
- Alteration, filed Dec 17, 2024, estimated cost $20K, described as “Installation of pipe scaffold at 1400 pelham parkway south, bronx as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Nov 8, 2024, estimated cost $1.6M, described as “Installation of stormwater management system (subsurface detention tanks) per dep private property green infrastructure retrofit incentive program. No change to use, egress, or occupancy.”
- Alteration, filed Oct 10, 2024, estimated cost $126K, described as “Filing for interior renovation of an existing commercial space including installation of new interior partition wall. Installation of new shelves & counter. Installation of kitchen hood & plumbing fixtures to be filed separately in DOBNOW.”
- Alteration, filed Jul 25, 2024, estimated cost $20K, described as “Installation of new sidewalk shed at 1400 pelham parkway south, bronx as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed May 10, 2024, estimated cost $231K, described as “1400 PELHAM PARKWAY SOUTH new steel framing at south wing eighth floor for new roof over seventh floor corridor. provide new steel framing for new slab penetration at eighth floor mechanical room. Raising the slab in storage room.”
- Alteration, filed Apr 23, 2024, estimated cost $807K, described as “Jacobi Medical Center proposed interior renovation of an MRI on third floor. No change in use, egress or occupancy. All as per plans filed herewith.”
- Alteration, filed Apr 5, 2024, estimated cost $3.5M, described as “Herewith filing general construction modifications for NYCHHC Jacobi Medical Center 11E OR renovation project. No change in use, egress, or occupancy.”
- Alteration, filed Apr 4, 2024, estimated cost $2.0M, described as “Removal of existing HVAC equipment - provide ventilation to the 7 fl west and south wing via installation of an AHU on the 8 fl MER and an RTU on the 11th fl and exhaust fan on 13th fl with ductwork diffusers grilles and piping”
- Alteration, filed Apr 4, 2024, estimated cost $1.0M, described as “1400 pelham parkway south - sprinkler modifications to provide new sprinkler in west and south wing 7TH floor”
- Alteration, filed Apr 4, 2024, estimated cost $1.5M, described as “1400 pelham parkway south - plumbing modifications to provide new sanitary vent domestic cld water & domestic hot water in west and south wing. Provide new oxygen medical air and vacuum in west south and east wing on on 7TH floor”
- Alteration, filed Apr 2, 2024, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Mar 27, 2024, estimated cost $4.0M, described as “1400 pelham parkway south - interior renovation including modifications to partitions, ceilings, floors and doors as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Mar 18, 2024, estimated cost $211K, described as “Disconnect existing standpipe system from roof tank. Remove unused pre-action systems. Remove existing sprinkler booster pump. Provide new fire pump for existing standpipe system. Fully sprinkler building with combined system including…”
- Alteration, filed Mar 1, 2024, estimated cost $950K, described as “Install one new 4000-gallon gasoline dw frp ust and all associated piping, one new fire suppression rack and supports, one new fuel dispenser, and one new veeder-root tls 450 plus and all associated sensors and probes. No change of use or…”
- No Work, filed Feb 21, 2024
- Alteration, filed Nov 8, 2023, estimated cost $15K, described as “Propose Mechanical scope of work filed in conjunction with GC# X00927806-I1. No change in use, egress and occupancy.”

51 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/2042050001/1400-pelham-parkway-south.

## Property taxes

- Assessment: $174,159,000
- Market value (city estimate): $387,020,000
- Taxable value: $0
- Assessed land: $13,075,650
- Assessed improvements: $161,083,350

## Zoning

R4: floor area ratio 0.84 built, 1.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Bronx Metro-North Station Area Study (City Planning 2022X0431): Zoning map change, Zoning text change, Completed, filed Mar 13, 2023, decided Aug 15, 2024. The Bronx Metro-North Neighborhood Plan is a community-informed vision for growth around two of four new planned Metro-North stations to be built in the Bronx. The study identifies strategies for growing housing, encouraging job growth,…
- JACOBI MEDICAL CENTER SEWER ESMNT (City Planning P2001X0400): Completed, decided Oct 20, 2003. RELOCATE & REALIGN A 450FT SEGMENT OF AN EXISTING 36-INCH\*SEWER & CONCOMITANT 25FT EASEMENT OFF OF RHINELANDER AVE\*TO THE CAMPUS TO FACILITATE THE CONSTRUCTION OF A 339-BED\*REPLACEMENT HOSPITAL ON THE CURRENT SITE OF EMPLOYEE PKG LOT