725 Brady Avenue, The Bronx
Public school · built c. 1930 · Block 4288, Lot 1.
Building permits
- New Building — Non-residential, filed May 12, 2022, 5 stories, described as “Llw# 120622: construction of new building addition to existing school as per plans filed herewith.”
- Alteration, filed Jun 2, 2026, estimated cost $10K, described as “Installation of temporary fence in conjunction with X01015627”
- Alteration, filed Jun 1, 2026, estimated cost $20K, described as “Installation of pipe scaffolding in conjunction with X01015627”
- Alteration, filed Jun 1, 2026, estimated cost $100K, described as “Installation of sidewalk shed in conjunction with X01015627”
- Alteration, filed Jun 30, 2025, estimated cost $277K, described as “Installation of 53.55 kw solar energy systemo on roof. No change of occupancy, use or egress.”
- Alteration, filed Jun 13, 2024, estimated cost $20K, described as “Sh/PS105X - for temporary construction equipment(emergency shed) submitting on behalf of contractor, in conjunction with LLW#133687 no change in use, occupancy or egress”
- Alteration, filed Mar 15, 2024, estimated cost $4.0M, described as “Interior renovation: new partitions, doors, finishes. Upgrades of existing rooms to areas of rescue assistance, new accessible hardware, signage. Auditorium: seating replacement, parapet & masonry rebuilding. No change to use, egress, or…”
- Alteration, filed Feb 15, 2024, estimated cost $10K, described as “Sidewalk shed for protection of public in conjunction with job # X00709562.”
- Alteration, filed Nov 21, 2023, estimated cost $50K, described as “105X- Proposed Support of Excavation for Utilities related to 4 Story NB and all related applications. All As per plans filed herewith”
- Alteration, filed Jul 27, 2023, estimated cost $500K, described as “Alteration of gymnasium entrance to install wheelchair lift and associated repairs. No change to use, egress, or occupancy.”
- Alteration, filed Jun 2, 2023, estimated cost $200K, described as “105X- Proposed Support of Excavation related to 4 Story NB and all related applications. All As per plans filed herewith”
- Alteration, filed Apr 24, 2023, estimated cost $20K, described as “Fn/PS105X - for temporary construction equipment(fence) submitting on behalf of contractor, in conjunction with DOB # X00709562NO change in use, occupancy or egress”
- Alteration, filed Aug 11, 2022, estimated cost $10K, described as “Llw # 120622: existing building temporary egress in conjunction w/ new building construction #X00709562.”
- No Work, filed Aug 10, 2022
- Alteration, filed Jun 21, 2022, estimated cost $20K, described as “Constructoin fence inconjuction with separate demolition filing (job # 201207979)”
- Alteration, filed Jun 21, 2022, estimated cost $15K, described as “Installation of construction fence inconjunction with job # X00498637”
- Alteration, filed Jun 21, 2022, estimated cost $20K, described as “Constructoin fence inconjuction with separate demolition filing (job # 201207988)”
- Alteration, filed Jun 6, 2022, described as “Installation of sprinkler and standpipe in conjunction with NB#X00709562 as per the plans filed herewith.”
- Alteration, filed May 31, 2022, estimated cost $200K, described as “Llw # 120622: existing building modification in conjunction w/ new building construction and connection of new and existing building. Installation of new non-exit doors in existing window and door locations. Adjacent NB filed under…”
- Alteration, filed Apr 7, 2021, estimated cost $400K, described as “Herewith filing for General Construction related to Stair Modifaction.”
- Alteration, filed Apr 5, 2021, estimated cost $400K, described as “Herewith filing for General Construction related to Stair Modifaction.”
Property taxes
- Assessment
- $5,252,850
- Market value (city estimate)
- $11,673,000
- Taxable value
- $0
- Assessed land
- $846,000
- Assessed improvements
- $4,406,850
Zoning
R7-1: floor area ratio 1.54 built, 3.44 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.