2311 Bronx Park East, The Bronx
Park · built 1984 · Block 4336, Lot 1.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Mar 16, 2026, estimated cost $50K, described as “Propose to perform shoring for tank work filed under X01182811. No change in use, egress or occupancy.”
- Alteration, filed Nov 12, 2025, estimated cost $1.0M, described as “Filing herewith retaining wall as per plans. No change in use, egress or occupancy.”
- Alteration, filed Apr 24, 2025, estimated cost $1.3M, described as “Install 1,000-gallon dw frp R95DIESEL ust, 1,000-gallon gasoline ust, one (1)R95 diesel and one (1) gasoline fuel dispenser with double-wall udc, piping, one fire suppressionsystem and supports, and one (1) veeder-root. No change to use or…”
- No Work, filed Sep 23, 2021, described as “Event area, in temporary tent, in the existing at grade terrace, adjacent to the banquet hall.”
- Alteration, filed Sep 23, 2021, estimated cost $5K, described as “Temporary tent for events at Stone Mill banquet room. Removed after programming. No changes to existing structures, use or egress.”
- Alteration, filed Aug 23, 2019, estimated cost $50K, described as “Civil engineering design services for the reconstruction of the playground at waring playground in bronx park. Proposed work includes replacement of existing reduced pressure zone (rpz) valve and associated piping interior to the existing…”
Building history
- New Building — Non-residential, filed Dec 15, 2014, signed off Sep 29, 2017, 1 story, described as “Composting toilets - herewith filing for a new building”
- New Building, filed Feb 8, 2013, signed off Aug 30, 2018, 1 story, described as “New building”
- New Building, filed Jun 26, 2009, signed off Aug 9, 2011, 1 story
- Demolition, filed Oct 21, 2008, signed off Mar 3, 2009, stories 1 to 0, described as “Demolition of greenhouse”
- Alteration, filed Apr 22, 2008, signed off Dec 14, 2010, described as “Snuff mill complete interior gut renovation and minor addition as per the atta ched plans.”
- New Building — Non-residential, filed Feb 25, 2003, signed off Jan 3, 2007, 1 story
- Alteration, filed Dec 20, 1994, signed off Jan 5, 1996, described as “Interior alteration to second floor, minor partition work around basement and 1ST floor level.”
- Alteration, filed Jul 27, 1993, permit issued - entire job/work, described as “Reconstruction of exist' pit houses and- erection of one story greenhous mechanical piping is to connect to - exist' greenhouse supply lines.”
- New Building, filed Jan 30, 1992, plan exam - disapproved, 1 story
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $29,447,100
- Market value (city estimate)
- $65,438,000
- Taxable value
- $0
- Assessed land
- $23,706,000
- Assessed improvements
- $5,741,100
Zoning
PARK.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Landmarks
Part of Lorillard Snuff Mill at the New York Botanical Garden (Individual Landmark). 7 Landmarks Preservation Commission permits are on file.