1 Orchard Beach, The Bronx
Park · built c. 1935 · Block 5650, Lot 1.
Building permits
- New Building, filed Nov 3, 2022, estimated cost $6.0M, 1 story, described as “Job to be assigned to development hub as per our HUB consultation. Filing herewith for a 1 story building framed with steel (Facility Building).”
- New Building, filed Nov 3, 2022, estimated cost $6.9M, 1 story, described as “Job to be assigned to development hub as per our HUB consultation. Filing herewith for 1 story Ammunition building as per plans filed herewith.”
- New Building — Non-residential, filed Nov 3, 2022, estimated cost $26.2M, 2 stories, described as “Filing herewith for a The two-story Mess Hall Building, Bathroom and Locker Room Building serves as the central campus node, for training officers and instructors.”
- New Building — Non-residential, filed Nov 3, 2022, estimated cost $145.1M, 1 story, described as “New Building filing for a indoor firing range. Job to be assigned to development hub as per hub consultation.”
- New Building — Non-residential, filed Oct 28, 2022, estimated cost $39.9M, 2 stories, described as “New Parks Department maintenance and operations building”
- New Building, filed Oct 28, 2022, estimated cost $7.8M, 1 story, described as “Job to be assigned to development hub as per our HUB consultation. Filing herewith for a 1 story Storage Building”
- Alteration, filed Oct 9, 2026, estimated cost $2.5M, described as “Installation of terracotta veneer at portions of the existing Orchard Beach Pavilion. No change to use, occupancy, egress, or floor area.”
- Alteration, filed Aug 4, 2026, estimated cost $61K, described as “Plumbing work on 1st and 2nd floor as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jul 21, 2026, estimated cost $5K, described as “Installation of temporary tent, no alt to exist structures for MTA-NYCT Bus Roadeo. TPA permit not required. Producer responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion.”
- Alteration, filed May 28, 2026, estimated cost $200K, described as “Civil plumbing drawings for catch basin work.”
- Alteration, filed May 28, 2026, estimated cost $5K, described as “Filing to install Temporary modular tent as per plans. No change in use, egress, or occupancy under this application.”
- No Work, filed Apr 8, 2026, described as “Wedding”
- Alteration, filed Apr 3, 2026, estimated cost $350K, described as “Empty, purge, clean, and remove (1) 1,000-gallon gasoline ust & (1) 1,000-gallon biodiesel ust. Remove above ground piping and equipment and clean and abandon in-place below ground piping.”
- Alteration, filed Feb 18, 2026, estimated cost $5K, described as “Filing to install Temporary modular tent as per plans. No change in use, egress, or occupancy under this application.”
- Alteration, filed Aug 14, 2025, estimated cost $8K, described as “Installation of 40x60 temporary tent, no alt to exist structures for MTA-NYCT Bus Rodeo. TPA permit not required. Producer responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion”
- No Work, filed Jun 20, 2025, described as “Requesting for temporary place of assembly - annual free music festival in parking lot (orchard beach). Block : 5650 / lot : 1”
- Alteration, filed May 27, 2025, estimated cost $15K, described as “Shoring as per drawings. Shoring shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Nov 1, 2024, estimated cost $2K, described as “Temporary work platform as per drawings. Work platform shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Aug 9, 2024, estimated cost $6K, described as “Installation of 40x100 temporary tent, no alt to exist structures for MTA-NYCT Bus Roadeo. TPA permit not required. Producer responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion”
- No Work, filed Jul 10, 2024, described as “Requesting for temporary place of assembly - annual free music festival in parking lot (orchard beach). Block : 5650 / lot : 1”
- Alteration, filed May 22, 2024, estimated cost $10K, described as “Filing for installation of temporary construction fence and double swing gates. No change in use, egress, or occupancy.”
- Alteration, filed Mar 8, 2024, estimated cost $236K, described as “Landscape work in conjunction with new building (job# 220420211).”
- Alteration, filed Dec 20, 2023, estimated cost $1K, described as “Installation of shoring as per plans filed herewith. This application is filed in conjunction with DOB X00642659-I1.”
- Alteration, filed Nov 15, 2023, estimated cost $323K, described as “Civil plumbing work in relation to NB 220420211 for NYC bomb squad.”
- Alteration, filed Nov 10, 2023, estimated cost $861K, described as “Civil work including pavements, walkways, driveway apron, parking area, accessory tent and utilities in conjunction with NB 220420211 for bomb squad.”
34 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $119,687,850
- Market value (city estimate)
- $265,973,000
- Taxable value
- $0
- Assessed land
- $79,772,850
- Assessed improvements
- $39,915,000
Zoning
PARK.
Flood zone
Current FEMA flood map: zone VE, high risk from coastal flooding with waves: a 1% chance each year, base flood elevation 17 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 15 ft (NAVD88).
Landmarks
Part of Orchard Beach Bathhouse and Promenade (Individual Landmark). 50 Landmarks Preservation Commission permits are on file.
Board and land use applications
- ORCHARD BEACH BATHHOUSE & PROMENADE (City Planning P2007X0001): Completed, decided Sep 18, 2006. LANDMARK SITE - PL2197