# 11 Water Street, Brooklyn

Industrial · built c. 1926 · Block 25, Lot 12.

On Umarelli: https://umarelli.org/nyc/3000250012/11-water-street

More construction in Dumbo: https://umarelli.org/nyc/brooklyn/dumbo.md

## Building permits

- Alteration, filed Oct 1, 2026, estimated cost $70K, described as “Install of temp tents, decking, trussing, no alt to exist structures for Seasonal Roebling Rink. TPA permit req. Producer is responsible to monitor site safety & implement HWAP. All prod equipment removed upon event complete.”
- No Work, filed Sep 29, 2026, described as “Brooklyn Bridge Park Gala in Emily Warren Roebling Plaza.”
- Alteration, filed Sep 29, 2026, estimated cost $30K, described as “Temporary structures for the BBP Gala at E.W. Roebling Plaza. Structures removed at the end of the programing. No changes to existing structures, use or egress.”
- No Work, filed Jun 5, 2026, described as “World Cup Fan Viewing experience with scheduled live performances and several activations showcasing Adidas and partners, open to the public.”
- Alteration, filed May 21, 2026, estimated cost $50K, described as “Install of platform, truss, partition, sculpture, inflatable. no alt to exist structures for FIFA World Cup at BK Bridge Park. TPA req. Producer responsible to monitor site safety & implement HWAP. All production equipment removed on event…”
- No Work, filed Nov 7, 2025, described as “Seasonal outdoor ice skating rink at Brooklyn Bridge Park. Open to the public with monitored entry.”
- Alteration, filed Oct 14, 2025, estimated cost $70K, described as “Install of temp tents, decking, trussing, no alt to exist structures for Roebling Rink at Brooklyn Bridge Park TPA permit required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon…”
- Alteration, filed Sep 30, 2025, estimated cost $30K, described as “Temporary structures for the BBP Gala at E.W. Roebling Plaza. Structures removed at the end of the programing. No changes to existing structures, use or egress.”
- No Work, filed Sep 30, 2025, described as “Gala with food, beverage and entertainment, in tents on Emily Warren Roebling Plaza.”
- No Work, filed Jun 26, 2025, described as “Outdoor concert and live stream of tennis matches, for the ticketed public.”
- Alteration, filed Jun 26, 2025, estimated cost $6K, described as “Installation of temp tents & platform, no alt to exist structures for The Hill in NY.TPA permit not required. Producer responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion.”
- No Work, filed Feb 6, 2024, described as “Seasonal outdoor ice rink with accessory spaces.”
- No Work, filed Nov 13, 2023, described as “Seasonal outdoor ice rink with accessory spaces.”
- Alteration, filed Oct 10, 2023, estimated cost $100K, described as “Temporary structures and occupancy for Glide, ice rink facility, at E.W. Roebling Plaza. Structures removed at the end of the programing. No changes to existing structures, use or egress.”
- No Work, filed May 17, 2023, described as “Gala for St. Ann's Warehouse, at Emily Warren Roebling Plaza, Brooklyn Bridge Park.”
- Alteration, filed May 16, 2023, estimated cost $12K, described as “Temporary structures and occupancy for St.Ann's Warehouse Gala. At E.W. Roebling Plaza. Structures removed at the end of the programing. No changes to existing structures, use or egress.”
- No Work, filed Aug 15, 2019, described as “We would like to request a Temporary Place of Assembly permit for an annual photo exhibition event sponsored by United Photo Industries at the 11-29 Water Street Brooklyn Bridge Park.”
- No Work, filed May 10, 2019, described as “19\_330-Reception tent with apparel and exhibits related to the Brooklyn Half Marathon. Food and beverage served, open to the public with monitored entry.”

## Property taxes

- Assessment: $2,150,100
- Market value (city estimate): $4,778,000
- Taxable value: $0
- Assessed land: $2,131,650
- Assessed improvements: $18,450

## Zoning

M2-1: floor area ratio 0.03 built, 2.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 12 ft (NAVD88).

## Landmarks

Part of Fulton Ferry Historic District (Historic District). 15 Landmarks Preservation Commission permits are on file.

## Board and land use applications

- Amended DUMBO BID (City Planning P2016K0439): Completed. Amend existing DUMBO BID

## In the news

[LPC to Review Plan to Build New Public Open Space Under the Brooklyn Bridge](https://www.brownstoner.com/development/brooklyn-bridge-park-11-water-street-fulton-ferry-historic-district-plaza-proposal-lpc-review/), Brownstoner, May 18, 2020.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
