Condominium · 46 units · built c. 1913 · Block 30, Lot 7501.

On Umarelli: https://umarelli.org/nyc/3000307501/168-plymouth-street

More construction in Dumbo: https://umarelli.org/nyc/brooklyn/dumbo.md

## Building permits

- Alteration, filed Jul 8, 2025, described as “Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Brian Barco”
- Alteration, filed May 20, 2025, estimated cost $9K, described as “Installation of heavy duty sidewalk shed as per plans. Sidewalk shed shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Mar 31, 2025, estimated cost $9K, described as “Installation of 300PSF sidewalk shed and pipe scaffolding as per plans. All equipment shall comply with ch #33 of the NYC code 2022. No change in use, occupancy or egress under this application.”
- Alteration, filed Feb 5, 2025, estimated cost $3K, described as “Facade Repair Project as per plans. No change in use, egress or occupancy”
- Alteration, filed Nov 25, 2024, described as “Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Brian Barco”
- Alteration, filed Sep 18, 2024, described as “Installation and use of suspended scaffold.”
- Alteration, filed Aug 10, 2021, estimated cost $5K, described as “Installation of pipe scaffolding as per plans. Pipe scaffolding shall comply with chapter #33 of the 2014 code, no change to use, egress or occupancy.”
- Alteration, filed Nov 24, 2020, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Nov 24, 2020, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Apr 17, 2020, estimated cost $10K, described as “Installation of sidewalk shed and construction fence as per plans. Sidewalk shed live load will be 300 psf. All equipment shall comply with chapter #33 of the 2014 code, no change to use, egress or occupancy.”
- Alteration, filed Apr 17, 2020, estimated cost $5K, described as “Installation of pipe scaffold as per plans. Pipe scaffold shall comply with chapter #33 of the 2014 code, no change to use, egress or occupancy.”
- Alteration, filed Apr 12, 2019, estimated cost $15K, described as “Installation of sidewalk shed, plywood fence and pipe scaffold as per plans. Sidewalk shed live load 600 psf. All equipment shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy under this application.”
- Alteration, filed Apr 12, 2019, estimated cost $15K, described as “Installation of sidewalk shed and pipe scaffold and construction fence, roof protection as per plans. Sidewalk shed live load 300PSF on plymouth st, and 600PSF on jay street side as per plans. .all equipment shall comply with chapter #33…”

## Property taxes

- Assessment: $11,044,972
- 2026–27 tax: $1,200,944
- Market value (city estimate): $24,544,376
- Taxable value: $11,044,737
- Assessed land: $1,305,452
- Assessed improvements: $9,739,520
- Condo units with their own tax lots: 47

## Tax breaks

- Co-op and condo abatement, with no end date, a $172,768 credit this tax year.

## Zoning

M1-4/R8A: floor area ratio 5.48 built, 6.02 allowed by base zoning.

## Recent sales

- Sep 30, 2025: $2,650,000, Unit THB
- May 28, 2025: $2,125,000, Apt 5F
- May 17, 2024: $1,999,000, Apt 4F
- Feb 23, 2024: $2,990,000, Unit THC
- Jan 26, 2023: $2,134,354, Apt 3D
- Jan 5, 2023: $4,950,740, Unit PHD
- Oct 25, 2022: $3,541,084, Apt 8C
- Oct 13, 2022: $2,113,887, Apt 3F
- May 20, 2022: $3,551,468, Unit THA
- May 17, 2022: $2,798,253, Unit THB

The 10 most recent of 47 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone X, moderate risk: a 0.2% chance of flooding each year.

## Landmarks

Part of DUMBO Historic District (Historic District). 2 Landmarks Preservation Commission permits are on file.

## In the news

[168 Plymouth Street Completes Construction in DUMBO, Brooklyn](https://newyorkyimby.com/2022/02/168-plymouth-street-completes-construction-in-dumbo-brooklyn.html), New York YIMBY, Feb 21, 2022.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology