589 Fulton Street, Brooklyn
Apartment building · 591 units · built 2023 · Block 149, Lot 14.
Building permits
- New Building — High-Rise, filed Aug 27, 2021, 591 units, 52 stories, described as “New 52 story mixed use building”
- Alteration, filed Sep 2, 2026, estimated cost $229K, described as “Hereby filing to remove, relocate, and install new sprinkler heads with related piping for restaurant fit out as shown on plans filed herewith. No change to use, occupancy or egress.”
- Alteration, filed Apr 21, 2026, estimated cost $4.2M, described as “Hereby filing interior tenant fitout of new restaurant within existing core and shell space as shown on plans filed herewith. No change to use, occupancy or egress.”
- Alteration, filed Feb 4, 2026, estimated cost $112K, described as “Hereby filing to construct slab openings and structural framing for new sump pit, elevator opening, staircase and load bearing walls as shown on plans filed herewith. No change to use, occupancy or egress.”
- Alteration, filed Jan 30, 2026, estimated cost $76K, described as “Hereby filing to install new mechanical unit with associated ductwork and piping for retail space as shown on plans filed herewith.”
- No Work, filed Oct 6, 2025
- No Work, filed Aug 21, 2025
- Alteration, filed Aug 19, 2025, estimated cost $12K, described as “Non-illuminated non-advertising accessory banner sign on scaffold platorm filed under job B01261288 - in property lines - the brook. No change of use, egress or occupancy.”
- Alteration, filed Jul 25, 2025, estimated cost $2K, described as “Temporary pipe scaffold as per drawings. Scaffold shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Mar 18, 2025, estimated cost $10K, described as “Installation of ADT material handling system.”
- Alteration, filed Mar 10, 2025, described as “Suspended scaffold for facade restoration as shown on plans”
- Alteration, filed Dec 6, 2024, estimated cost $2K, described as “Temporary work platform as per drawings. Work platform shall comply with ch 33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jan 31, 2024, described as “Installation of temporary suspended scaffolds per plan submitted. Work shall comply with 2022 building code chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jan 24, 2024, described as “Installation of an adt access system on the roof as per plans. No change in use, egress or occupancy under this application. Scaffold to comply with chapter 33 of NYC building code of 2022.”
- Alteration, filed Jan 19, 2024, estimated cost $10K, described as “Installation of an adt access system on the roof as per plans. No change in use, egress or occupancy under this application. Add material lifting crab.”
- Alteration, filed Dec 28, 2023, estimated cost $1K, described as “Curb cut filed in conjunction with new building”
- Alteration, filed Nov 20, 2023, estimated cost $1K, described as “Application for the installation and use of mobile equipment as per plans filed herein. No change in egress, use or occupancy.”
- Alteration, filed Nov 16, 2023, estimated cost $1K, described as “Installation and use of telehandler as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Sep 5, 2023, estimated cost $2K, described as “Temporary trolley beam system during NB const, filed sep. Trolley beam system shall comply with ch 33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Aug 29, 2023, estimated cost $50K, described as “Temporary hoist run-back structure during new bldg construction, filed separately. Hoist run-back structure shall comply with ch #33 of the NYC bldg code. No change in use, occupancy or egress under this application. Hoist & elevator appl…”
- Alteration, filed Aug 29, 2023, estimated cost $3K, described as “Temporary roof protection at adjacent property (563 fulton st) during NB const, filed sep. Roof protection shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Aug 25, 2023, estimated cost $3K, described as “Construction fence as per drawings during NB const, filed sep. Construction fence shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Aug 17, 2023, estimated cost $1K, described as “Installation and use of temporary cocoon as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Aug 12, 2023, estimated cost $10K, described as “Installation and use of concrete placing boom during new building constrution, filed separately under B00571785-I1.”
- Alteration, filed Mar 27, 2023, estimated cost $20K, described as “Cars a&b: installation of dual 7500# capacity personnel/material hoists during NB const. Filed sep. Hoists shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Elev appl sub to elev dept.”
48 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $75,677,850
- 2026–27 tax
- $9,413,568
- Market value (city estimate)
- $168,173,000
- Taxable value
- $75,677,850
- Assessed land
- $2,365,200
- Assessed improvements
- $73,312,650
Zoning
C6-4.5: floor area ratio 20.53 built, above the 12.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Aug 3, 2022: $144,374,697, sold with other lots
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- 589 Fulton Street (Curb Cut Authorization) (City Planning 2022K0112): Authorization, Completed, filed Feb 7, 2023, decided Aug 28, 2023. A private application requesting a curb cut authorization pursuant to ZR 101-51 to facilitate a new as-of-right mixed-use development, at 589 Fulton Street, in the Downtown Brooklyn neighborhood of Community District 2, Brooklyn.
- Proposed Extension of the Downtown Brooklyn BID (City Planning 2027K0210): Business improvement district, In Public Review. An action to facilitate a merger of 2 Business Improvement Districts (BID) and 1 Special Assessment District (SAD). The merger of the MetroTech Area BID, Court-Livingston-Schermerhorn BID and Fulton Mall SAD in Downtown Brooklyn, Community…
In the news
The Brook Wraps Up Construction at 567 Fulton Street in Downtown Brooklyn, New York YIMBY, Dec 10, 2025.