9 Dekalb Avenue, Brooklyn
Condominium · 541 units · built 2021 · Block 149, Lot 7503.
Building permits
- Alteration, filed Oct 14, 2026, estimated cost $600, described as “Erect accessory business wall sign for los tacos no. 1. No change in use, egress, or occupancy.”
- No Work, filed Oct 9, 2026, described as “Event for a future tenant presentation retail space.”
- Alteration, filed Aug 21, 2026, estimated cost $418K, described as “Interior fit out new leasing office as accessory to an existing residential lobby.”
- Alteration, filed Aug 13, 2026, estimated cost $349K, described as “General construction for 1ST floor business "restaurant" tenant-fit-out renovations as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Aug 11, 2026, estimated cost $23K, described as “Structural steel support work on 1ST floor associated with business "restaurant" tenant-fit-out renovations as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Aug 11, 2026, estimated cost $181K, described as “New mechanical installation work associated with 1ST floor business "restaurant" renovations as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jul 29, 2026, estimated cost $80K, described as “New plumbing work associated with 1ST floor business "restaurant" renovations as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jul 29, 2026, estimated cost $93K, described as “Modification of existing sprinkler system associated with 1ST floor business "restaurant" tenant-fit-out renovations as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jul 15, 2026, estimated cost $3K, described as “Installation of temporary stone parapet shoring as per plans. No change in use, egress or occupancy.”
- No Work, filed Jul 7, 2026
- Alteration, filed Jun 2, 2026, described as “Temporary suspended scaffold system during bldg construction, filed separately. Suspended scaffold shall comply with ch 33 of the NYC bc. No change in use, occupancy or egress under this application.”
- No Work, filed Mar 18, 2026
- No Work, filed Mar 18, 2026
- Alteration, filed Mar 5, 2026, estimated cost $10K, described as “Filing for Sprinkler Temporary Loop”
- Alteration, filed Dec 22, 2025, described as “Installation of 2 pt suspended scaffold in accordance with nycc 2022 chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Oct 9, 2025, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 30, 2025, estimated cost $427K, described as “Restoration facade repairs, partial roof replacement of hexagonal setback roof , parapet repairs, repoint dome TC joints.”
- No Work, filed Jun 25, 2025
- Alteration, filed Jun 18, 2025, estimated cost $4.8M, described as “Interior fit out”
- Alteration, filed May 30, 2025, estimated cost $11K, described as “Installation of pipe scaffolding as per plans. Pipe scaffolding shall comply with chapter # 33 of the 2022 code, no changess in use in egress or occupancy under this application.”
- Alteration, filed May 29, 2025, estimated cost $80K, described as “Temporary platforms supported by existing building structure as shown on plans”
- Alteration, filed May 6, 2025, estimated cost $1K, described as “This application is filed for a temporary use permit pursuant to section ac 28-111 and building bulletin 2010-002.”
- Alteration, filed Sep 24, 2024, estimated cost $2K, described as “Temporary overhead protection during NB const, filed sep. Overhead protection shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jul 15, 2024, described as “Installation of suspended scaffold for facade inspection/repair. SR23/2317”
- Alteration, filed Apr 22, 2021, estimated cost $1K, described as “Emergency generator”
2 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $103,825,350
- 2026–27 tax
- $11,680,713
- Market value (city estimate)
- $230,722,994
- Taxable value
- $97,360,613
- Assessed land
- $5,628,152
- Assessed improvements
- $98,197,198
- Condo units with their own tax lots
- 150
Tax breaks
- Co-op and condo abatement, with no end date, a $30,726 credit this tax year.
Zoning
C6-4.5: floor area ratio 13.31 built, above the 12.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Aug 13, 2026: $2,325,000, Apt 74A
- Jul 27, 2026: $1,990,000, Apt 53A
- Jul 16, 2026: $1,435,000, Apt 59D
- Jun 25, 2026: $3,555,000, Apt 74C
- Jun 24, 2026: $1,965,000, Apt 69G
- Jun 23, 2026: $2,675,000, Apt 57C
- Jun 17, 2026: $2,400,000, Apt 53B
- Jun 16, 2026: $2,950,000, Apt 56F
- Jun 12, 2026: $3,040,000, Apt 58F
- May 15, 2026: $3,150,000, Apt 71D
The 10 most recent of 48 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Dime Savings Bank: Individual Landmark, Dime Savings Bank, first floor interior: Interior Landmark, Dime Savings Bank (Interior Landmark). 12 Landmarks Preservation Commission permits are on file.
Board and land use applications
- Proposed Extension of the Downtown Brooklyn BID (City Planning 2027K0210): Business improvement district, In Public Review. An action to facilitate a merger of 2 Business Improvement Districts (BID) and 1 Special Assessment District (SAD). The merger of the MetroTech Area BID, Court-Livingston-Schermerhorn BID and Fulton Mall SAD in Downtown Brooklyn, Community…
In the news
Podium Work Continues on The Brooklyn Tower at 9 DeKalb Avenue in Downtown Brooklyn, New York YIMBY, Dec 29, 2024.