15 Hanover Place, Brooklyn
Apartment building · 314 units · built 2022 · Block 161, Lot 3.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- New Building — Tower, filed Sep 21, 2021, 314 units, 34 stories, described as “Construction of a new 34 story mixed-use building.”
- Alteration, filed Jun 17, 2026, estimated cost $428K, described as “Interior renovation of existing ground floor as per plans for a new retail store PERSPIRE SAUNAS, No change of use, egress or occupancy.”
- Alteration, filed May 24, 2026, estimated cost $1K, described as “Non-illuminated non-advertising double-face projecting accessory sign - eyebox. No change of use, egress or occupancy.”
- Alteration, filed May 8, 2026, estimated cost $280K, described as “General construction work for Interior renovation to include demolition of existing and construction of new partitions. Work to include the fitout of mezzanine. no change in use, egress, or occupancy.”
- Alteration, filed Oct 23, 2025, estimated cost $119K, described as “Interior renovation of existing retail establishment, new walls floor ceiling and finishes”
- Alteration, filed May 1, 2025, estimated cost $375, described as “Non-illuminated non-advertising accessory wall sign - le cafe coffee. No change of use, egress or occupancy.”
- Alteration, filed May 1, 2025, estimated cost $375, described as “Non-illuminated non-advertising accessory wall sign - le cafe coffee. No change of use, egress or occupancy.”
- Alteration, filed Dec 10, 2024, estimated cost $50K, described as “Demolition/General Contraction as shown on plans filed herewith. No change in use, egress of occupancy.”
- Alteration, filed Oct 7, 2024, estimated cost $5K, described as “Installation of 300 psf sidewalk shed as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Sep 27, 2024, estimated cost $1K, described as “This application is filed for a Temporary Use Permit for a sales office including model units pursuant to section AC 28-111 and Buildings Bulletin 2010-002. Application filed in conjunction with NB # B00588594-I1”
- Alteration, filed Aug 12, 2024, estimated cost $10K, described as “Installation of ADT mobile material hoist”
- Alteration, filed Jul 22, 2024, estimated cost $1K, described as “This application is filed for a Temporary Use Permit for a sales office including model units pursuant to section AC 28-111 and Buildings Bulletin 2010-002. Application filed in conjunction with NB # B00588594-I1”
- Alteration, filed Mar 21, 2024, estimated cost $5K, described as “Temporary pipe scaffold as per drawings. Scaffold shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Oct 12, 2023, estimated cost $10K, described as “Installation of ADT work access system”
- Alteration, filed May 19, 2023, estimated cost $1K, described as “Installation of overhead protections during construction. Overhead protection shall comply with nycc 2022 chapter 33. No change in egress, use, or occupancy.”
- Alteration, filed Mar 17, 2023, estimated cost $10K, described as “Installation of dual personnel-material hoist & runback structure in accordance with nycc 2022 chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Jan 3, 2023, estimated cost $5K, described as “Use of mini crane at 15 hanover place during new building construction, filed separately under B00588594”
- Alteration, filed Dec 22, 2022, estimated cost $1K, described as “Application for the installation and use of mini crane”
- Alteration, filed Nov 29, 2022, estimated cost $1K, described as “Installation of sidewalk shed on the roadway in accordance with nycc chapter 33 building code. No chane in egress, use, or occupancy.”
- Alteration, filed Sep 9, 2022, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 9, 2022, estimated cost $4K, described as “Installation of 8' high plywood construction fence”
- Alteration, filed Jul 21, 2022, estimated cost $25K, described as “Interior Demolition as shown on plans filed herewith, No change in use, egress or occupancy.”
- Alteration, filed Jun 29, 2022, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jun 29, 2022, described as “Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jun 29, 2022, described as “Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
21 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $40,190,400
- 2026–27 tax
- $581,964
- Market value (city estimate)
- $89,312,000
- Taxable value
- $4,678,542
- Assessed land
- $1,712,250
- Assessed improvements
- $38,478,150
Zoning
C6-4: floor area ratio 13.83 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Proposed Extension of the Downtown Brooklyn BID (City Planning 2027K0210): Business improvement district, In Public Review. An action to facilitate a merger of 2 Business Improvement Districts (BID) and 1 Special Assessment District (SAD). The merger of the MetroTech Area BID, Court-Livingston-Schermerhorn BID and Fulton Mall SAD in Downtown Brooklyn, Community…
In the news
Hanover House Wraps Up Construction at 17 Hanover Place in Downtown Brooklyn, New York YIMBY, Dec 8, 2024.