130 Clinton Street, Brooklyn
Co-op · 89 units · built c. 1925 · Block 264, Lot 17.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Jan 22, 2026, described as “Facade Inspection”
- Alteration, filed Jul 15, 2025, described as “File suspended scaffold outrigger system for facade restoration and inspection.”
- Alteration, filed Mar 20, 2025, estimated cost $70K, described as “Remove and install non-load bearing partitions in unit 3B per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Aug 8, 2024, described as “CD5 amendment for adding material hoist”
- Alteration, filed Jun 23, 2023, estimated cost $1K, described as “Installation of temporary knee bracket as per plans. No change in use, egress or occupancy shall comply with CHAPTER#33 of 2022 the ny building code.”
- Alteration, filed Jun 23, 2023, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”
- Alteration, filed Mar 15, 2023, estimated cost $500K, described as “Facade repairs, terrace cotta stone replacement, calking, stone replacement, sill replacement, crack repairs, patching, coping and repointing repairs as per plans filed herewith.”
- Alteration, filed Sep 20, 2022, estimated cost $38K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 12TH floor (apt 12C) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Feb 15, 2022, estimated cost $5K, described as “Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jan 4, 2022, estimated cost $23K, described as “Scope of work includes: modification to non-load bearing partitions & doors, new kitchen cabinets, new storage millwork, replacement of plumbing fixtures in kind, new floor and wall tiling in bathroom. New tile backsplash in kitchen.”
- Alteration, filed Oct 1, 2021, estimated cost $80K, described as “Install of non-bearing interior partition wall. No work proposed on exterior. No change to use, egress, and occupancy.”
- Alteration, filed May 21, 2021, estimated cost $90K, described as “Renovation of existing first floor in existing residential building. Architectural work only. No change in use, occupancy, or egress.”
- Alteration, filed Apr 19, 2021, estimated cost $22K, described as “Plumbing works in conjunction with Alt-II applicaiton#: B00455233. No change in use, egress, and occupancy.”
- Alteration, filed Jan 29, 2021, estimated cost $2K, described as “Installation of construction fence as per plan, no change in use, egress or occupany”
- Alteration, filed Jan 24, 2021, estimated cost $63K, described as “Inter renov of coop duplex apt: to relocate existing kit & bathroom. Removal & disposal of gwb, flr & wall finishes & ltg fixts. Installation of new gwb, floor & wall finishes, replacement ltg fixts. No change to use, egress or occupancy.…”
- Alteration, filed Apr 29, 2020, estimated cost $22K, described as “Filing herewith to replace, relocate existing fixtures with new on existing rough-in. No change to use, occupancy, or egress.”
Building history
- Major Renovation — Conversion, filed Mar 19, 1991, permit issued - entire job/work, 89 units added, 12 stories, described as “Renovation and enlargement of existing lobby and super's apartment on the firs t floor. Proposed decrease of the first floor arcade. Amended certificate of o ccupancy to be obtained.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $8,630,550
- 2026–27 Tax
- $888,701
- Market value (city estimate)
- $19,179,000
- Taxable value
- $8,329,760
- Assessed land
- $612,000
- Assessed improvements
- $8,018,550
Tax breaks
- Co-op and Condo Abatement, with no end date, a $147,841 credit this tax year.
Zoning
C5-2A: floor area ratio 11.66 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jun 18, 2026: $1,025,000
- Mar 2, 2026: $879,000
- Dec 31, 2025: $229,000
- Dec 18, 2025: $900,000
- Aug 8, 2025: $950,000
- May 30, 2025: $725,000
- Feb 7, 2025: $505,000
- Aug 23, 2024: $1,075,000
- Apr 26, 2024: $1,170,000
- Jan 8, 2024: $835,000
The 10 most recent of 53 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Brooklyn Heights Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.
Board and land use applications
- Variance or Special Permit (Board of Standards and Appeals 294-12-BZ): Variance or Special Permit, Granted, filed Oct 11, 2012, decided May 7, 2013. Special Permit (§73-36) to allow a physical culture establishment (Everyday Athlete). C5-2A/DB special zoning district.