# 92 Boerum Place, Brooklyn

Vacant land · Block 278, Lot 1.

On Umarelli: https://umarelli.org/nyc/3002780001/92-boerum-place

More construction in Boerum Hill: https://umarelli.org/nyc/brooklyn/boerum-hill.md

## Building permits

- New Building — Multi-Family, filed Mar 18, 2025, 6 units, 6 stories, described as “Propose new 6-story residential building as per plan. Obtain new Certificate of Occupancy.”
- Alteration, filed Jul 11, 2026, estimated cost $1K, described as “Filing to protect neighbor during minor facade repair work. This system is a site specific engineered enclosure system subject to the requirements of bc 3309.17. No change in use, egress, or occupancy”
- Alteration, filed Jul 11, 2026, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the NYC building code.live load 300PSF.”
- Alteration, filed Feb 11, 2025, estimated cost $5K, described as “Installation of construction fence at sidewalk as per drawings.”
- Alteration, filed Nov 25, 2024, estimated cost $5K, described as “Installation of a heavy duty sidewalk shed and medium duty pipe scaffold as per plans during general construction work. No change in use, egress or occupancy. Sidewalk shed & pipe scaffold to comply with chapter 33 of NYC building code of…”
- Alteration, filed Oct 23, 2024, estimated cost $160, described as “Proposed construction fence. No change to use, egress or occupancy under this application”
- Demolition, filed Oct 17, 2024, estimated cost $50K, described as “Full demolition to a four story house”
- Alteration, filed Oct 18, 2022, estimated cost $7K, described as “Proposed installation of pipe scaffold for remedial repairs as per plans. No change in use occupancy or egress under this application.”
- Alteration, filed Oct 18, 2022, estimated cost $8K, described as “Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use occupancy or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code.”
- Alteration, filed Dec 2, 2021, estimated cost $1K, described as “Temporary 8' High Construction Solid Fence”
- Alteration, filed Apr 20, 2021, estimated cost $1K, described as “Sprinkler filing in conjunction with NB #321599347.”
- Alteration, filed Apr 12, 2021, estimated cost $1K, described as “Structural work as per plans filed in conjunction with NB #321599347”
- Alteration, filed Apr 1, 2021, estimated cost $1K, described as “Foundation work as per plans filed.”
- Alteration, filed Mar 30, 2021, estimated cost $1K, described as “Support of excavation as per plans filed in conjunction with NB BIS #321599347.”
- Alteration, filed Jan 28, 2021, estimated cost $1K, described as “Mechanical application as per plans filed, in conjunction with NB #321599347”
- Alteration, filed Jan 28, 2021, estimated cost $1K, described as “Plumbing application as per plans filed. Filed in conjunction with NB #321599347”

## Property taxes

- Assessment: $308,250
- 2026–27 tax: $23,985
- Market value (city estimate): $685,000
- Taxable value: $221,102
- Assessed land: $308,250

## Zoning

R6A: floor area ratio 0.00 built, 3.00 allowed by base zoning.

## Recent sales

- Dec 11, 2024: $2,478,600

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## In the news

[Below-Grade Work Progresses at 92 Boerum Place in Cobble Hill, Brooklyn](https://newyorkyimby.com/2026/04/below-grade-work-progresses-at-92-boerum-place-in-cobble-hill-brooklyn.html), New York YIMBY, Apr 7, 2026.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
