339 Hicks Street, Brooklyn
Health care · built 2022 · Block 284, Lot 7.
Building permits
- Alteration, filed Jun 22, 2026, estimated cost $235K, described as “NYU Cobble Hill X-Ray and Control Room Conversion - General construction modifications including changes to floors, partitions, ceilings and doors as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed May 11, 2026, estimated cost $100K, described as “Herewith filing sprinkler modifications for NYU Cobble Hill Foam System Removal and new sprinkler piping/heads connected to existing system. No change in use, egress, or occupancy.”
- Alteration, filed Dec 1, 2025, estimated cost $140K, described as “Nyu - ex. Fans - mechanical modifications according to plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Oct 22, 2025, estimated cost $140K, described as “Nyu - ex. Fans - mechanical modifications according to plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Sep 15, 2022, estimated cost $1K, described as “Installation and use of temporary mini mobile crane as per plans filed herewith. No change to use, egress or occupancy under this application.”
- Alteration, filed Jun 7, 2022, estimated cost $4K, described as “Installation of single 2000 # capacity material only hoist during NB const, filed sep. Hoist shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jun 7, 2022, estimated cost $4K, described as “Installation of temporary scaffold as per drawings. Scaffold shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed May 17, 2022, estimated cost $40K, described as “Use of mini crane at 70 atlantic avenue during major alteration, filed separately under 320908559”
- Alteration, filed Apr 25, 2022, estimated cost $5K, described as “Installation of temporary work platform as per drawings. Work platform shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jan 13, 2022, estimated cost $25K, described as “Installation of temporary work platform as per drawings. Work platform shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Dec 14, 2021, estimated cost $25K, described as “Installation of temporary trolley beam system as per drawings. Trolley beam system shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under thisapplication”
- Alteration, filed Nov 18, 2021, estimated cost $996, described as “Installation of temporary work platform as per drawings. Work platform shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Oct 13, 2021, estimated cost $42K, described as “Installation of temporary work platforms as per drawings. Temporary work platforms shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jul 2, 2021, estimated cost $50K, described as “Installation of a temporary system scaffold stair tower as per drawings. Stair tower shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed May 19, 2021, estimated cost $3K, described as “Herewith filing for emergency generator in conjunction with NB applicationjob# 320908559 for the cobble hill building. No change in use, egress, oroccupancy.”
- Alteration, filed May 18, 2021, estimated cost $3K, described as “Herewith filing for installation of a 12,000 gallon, single wall, primary fuel oil tank in the sub-cellar (3-hr tank vault)and a 290 gallon fuel oil day tank on the fifth floor. No change to use, egress, or occupancy.”
- Alteration, filed May 10, 2021, estimated cost $3K, described as “Herewith filing for sprinkler/standpipe systems in conjunction with NB applicationjob# 320908559 for the cobble hill building to provide fire protection systems through new building. No change in use, egress, oroccupancy.”
- Alteration, filed May 5, 2021, estimated cost $3K, described as “Herewith filing for new boiler installations on the fifth floor in conjunction with NB 320908559. Fuel oil storage tanks are filed and being installed under application B00485257. No change in use, egress, or occupancy.”
- Alteration, filed Apr 28, 2021, estimated cost $8K, described as “Installation of plywood fence during NB construction filed sep. Plywood fence shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Apr 26, 2021, estimated cost $20K, described as “Installation of dual 6000# capacity personnel/material hoists during NB const, filed sep. Hoists shall comply with ch #33 of the NYC bldg code. No change in use, occupancy or egress under this application. Elevator application submitted…”
- Alteration, filed Mar 24, 2021, estimated cost $10K, described as “Installation of temporary overhead protection at adjacent property (94 atlantic ave) during NB construction, filed sep. Overhead protection shall comply with ch #33 of the NYC bldg code. No change in use, occupancy or egress under this…”
- Alteration, filed Jan 28, 2021, estimated cost $38K, described as “Installation of temporary roof protection at adajecent property (88 atlantic ave) during NB construction, filed sep. Temporary roof protection shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this…”
- Alteration, filed Sep 28, 2020, estimated cost $54K, described as “Installation of scaffold as per drawings. Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Jul 31, 2020, estimated cost $140K, described as “Installation of heavy duty sidewalk shed during NB construction, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Dot permits by others for shed installed on…”
- Alteration, filed Mar 13, 2020, estimated cost $120K, described as “Installation of construction fence during new building construction, filed separately. Construction fence shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
1 more, older permit is in this building’s full list on the map.
Property taxes
- Assessment
- $28,589,850
- Market value (city estimate)
- $63,533,000
- Taxable value
- $0
- Assessed land
- $2,596,050
- Assessed improvements
- $25,993,800
Tax breaks
- Nonprofit exemption (hospital), with no end date, about $3,101,427 a year below the full tax.
Zoning
R6: floor area ratio 4.81 built, above the 2.43 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Mar 13, 2020: $10,100,000
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- LONG ISLAND COLLEGE HOSP LSCFD (City Planning P2000K0378): Completed, decided Aug 31, 2000. 444 SPACE ACCESSORY PARKING FACILITY TB282. TL1.
In the news
NYU Langone Ambulatory Care Clinic’s Façade Nears Completion at 70 Atlantic Avenue in Cobble Hill, Brooklyn, New York YIMBY, Sep 4, 2022.