20 Bergen Street, Brooklyn
Parochial School · built c. 1920 · Block 384, Lot 16.
Building permits
- Alteration, filed May 2, 2023, estimated cost $175K, described as “Renovation of office and lobby spaces on Floors 1 and 2 as per plans attached.”
- Alteration, filed Aug 30, 2021, estimated cost $53K, described as “Install new chimney liner in existing masonry chimney. Install new chimney offset, draft inducer and new chimney extension as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 7, 2020, estimated cost $100K, described as “Plumbing and sprinkler modifications with in the existing school building”
- No Work, filed Jan 22, 2020
- No Work, filed Jan 22, 2020
- No Work, filed Jan 22, 2020
- Alteration, filed Mar 28, 2019, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 26, 2019, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Feb 6, 2019, described as “Installation of fence as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jan 29, 2019, described as “Installation of heavy-duty sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 26, 2018, described as “Installation of fence as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 4, 2018, estimated cost $5K, described as “Installation of a plywood fence, as per drawings during building demolition, filed separately. Plywood fence shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed May 1, 2018, described as “Installation of heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 1, 2018, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Apr 25, 2018, estimated cost $5K, described as “Installation of a plywood fence, as per drawings during building demolition, filed separately. Plywood fence shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
Property taxes
- Assessment
- $5,160,150
- Market value (city estimate)
- $11,467,000
- Taxable value
- $0
- Assessed land
- $176,850
- Assessed improvements
- $4,983,300
Tax breaks
- Nonprofit exemption (school), with no end date, about $559,773 a year below the full tax.
Zoning
R6A (part of the lot is R6B): floor area ratio 4.16 built, above the 3.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Variance or special permit (Board of Standards and Appeals 2017-57-BZ): Variance or special permit, Granted, filed Mar 2, 2017, decided Jul 11, 2017. Variance (§72-21) to permit the enlargement of an existing School (Mary McDowell Friends School) UG 3 contrary to ZR §24-11 (floor area increased the degree of non-compliance and lot coverage); ZR §23-33 (opposed 2 story addition in the…