# 58 Saint Marks Place, Brooklyn

Condominium · 100 units · built 2019 · Block 395, Lot 7503.

On Umarelli: https://umarelli.org/nyc/3003957503/58-saint-marks-place

More construction in Boerum Hill: https://umarelli.org/nyc/brooklyn/boerum-hill.md

## Building permits

- Alteration, filed Oct 14, 2025, estimated cost $5K, described as “Installation of 300PSF sidewalk shed per plans. Sidewalk shed shall comply with chapter # 33 of the NYC code 2022, no changes in use egress or occupancy under this application.”
- Alteration, filed Jul 20, 2022, estimated cost $600, described as “Erect non-illuminated accessory d/f blade wall sign below storefront canopy structure, non-flashing, non-advertising sign, no change in use, egress, or occupancy”
- Alteration, filed Jul 20, 2022, estimated cost $1K, described as “Erect direct illuminated accessory d/f blade wall sign below storefront canopy structure, non-flashing, non-advertising sign, no change in use, egress, or occupancy”
- Alteration, filed Jul 20, 2022, estimated cost $6K, described as “Erect direct illuminated accessory channel leteer wall sign with raceway below storefront canopy structure, non-flashing, non-advertising sign, no change in use, egress, or occupancy”
- Alteration, filed Dec 3, 2021, estimated cost $1K, described as “Tenant build out in cellar/1ST floor vacant store in conjunction with NB application #321386175.no change to use, egress or occupancy.”
- Alteration, filed Jan 26, 2021, estimated cost $52K, described as “Installation of pipe scaffold as per drawings. Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Oct 30, 2020, estimated cost $1K, described as “Structural application as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB# 321386175”
- Alteration, filed Jun 22, 2020, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Mar 10, 2020, estimated cost $30K, described as “Installation of plywood fence during new building construction, filed separately. Plywood fence shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Mar 10, 2020, estimated cost $50K, described as “Installation of heavy duty sidewalk shed during NB const, filed separately. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Jun 6, 2019, estimated cost $1K, described as “Curb cut application filed in conjunction with NB# 321386175”
- Alteration, filed Jan 22, 2019, estimated cost $1K, described as “Fence application as per plans filed”
- Alteration, filed Oct 26, 2018, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 26, 2018, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 26, 2018, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 19, 2018, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 17, 2018, estimated cost $2K, described as “Installation of construction fence, to protection site during demolition under DM#321790656”
- Alteration, filed Oct 17, 2018, estimated cost $2K, described as “Installation of construction fence to protect site, at time of demolition under DM# 321790665”
- Alteration, filed Oct 17, 2018, estimated cost $2K, described as “Installation of construction fence, to protect site during demolition”
- Alteration, filed Oct 9, 2018, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 5, 2018, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”

## Property taxes

- Assessment: $31,605,310
- 2026–27 tax: $3,083,403
- Market value (city estimate): $70,234,004
- Taxable value: $27,248,062
- Assessed land: $312,303
- Assessed improvements: $31,293,007
- Condo units with their own tax lots: 102

## Zoning

C4-4D: floor area ratio 6.90 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Jun 29, 2026: $1,895,000, Apt 409
- Apr 22, 2026: $1,950,000, Apt 212
- Apr 16, 2026: $1,025,000, Apt 205
- Mar 27, 2026: $1,430,000, Apt 407
- Feb 17, 2026: $695,000, Apt 406
- Jan 7, 2026: $2,400,000, Apt 608
- Oct 31, 2025: $1,220,000, Apt 301
- Sep 16, 2025: $3,388,888, Apt 1001
- Sep 12, 2025: $1,150,000, Apt 209
- Sep 4, 2025: $2,915,000, Apt 911

The 10 most recent of 108 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## In the news

[58 Saint Marks Place Completes Construction in Boerum Hill, Brooklyn](https://newyorkyimby.com/2022/06/58-saint-marks-place-completes-construction-in-boerum-hill-brooklyn.html), New York YIMBY, Jun 29, 2022.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
