529 President Street, Brooklyn
Hotel · built 2022 · Block 441, Lot 53.
Building permits
- Alteration, filed Sep 5, 2023, estimated cost $375, described as “Non-illuminated non-advertising accessory wall sign - in property lines - tru by hilton. No change of use, egress or occupancy.”
- Alteration, filed Sep 5, 2023, estimated cost $3K, described as “Indirectly illuminated non-advertising accessory wall sign - in property lines - tru by hilton. No change of use, egress or occupancy.”
- Alteration, filed Sep 5, 2023, estimated cost $700, described as “Illuminated non-advertising accessory wall sign - in property lines - tru by hilton. No change of use, egress or occupancy.”
- Alteration, filed Apr 18, 2023, estimated cost $45K, described as “Install fuel oil storage tank for generator servicing new building in conjunction with NB# 320862161.”
- Alteration, filed Jan 11, 2023, estimated cost $1K, described as “Propose 24 feet curb cut includes (2) 2'-6" splays in conjunction with NB#320862161.”
- Alteration, filed Oct 21, 2022, estimated cost $15K, described as “Proposed installation of pipe scaffold for remedial repairs as per plans. No change in use occupancy or egress under this application.”
- Alteration, filed Aug 3, 2022, estimated cost $15K, described as “Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use occupancy or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code.”
Property taxes
- Assessment
- $6,444,900
- 2026–27 tax
- $617,845
- Market value (city estimate)
- $14,322,000
- Taxable value
- $5,695,470
- Assessed land
- $1,128,600
- Assessed improvements
- $5,316,300
Zoning
M1-4 (part of the lot is M1-4/R6B): floor area ratio 2.74 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Extension to finish construction (Board of Standards and Appeals 2022-4-BZY): Extension to finish construction, Granted, filed Jan 18, 2022, decided Dec 5, 2022. Extension of time (§11-332) to complete construction of a minor development commenced under the prior zoning. M1-4/R6B zoning district
- Gowanus Neighborhood Plan (City Planning 2018K0382): Zoning map change, Zoning text change, City map change, Urban development action area, Completed, decided Dec 6, 2021. The Gowanus Neighborhood Plan is a shared, long-term vision for a thriving neighborhood. It looks to identify strategies for an equitable, resilient and sustainable Gowanus, with more local jobs and housing. The Plan supports community…
In the news
Tru by Hilton Hotel Nears Completion at 529 President Street in Gowanus, Brooklyn, New York YIMBY, Sep 25, 2023.