130 3rd Street, Brooklyn
Hostel · built c. 1910 · Block 466, Lot 1.
Building permits
- Alteration, filed Jul 16, 2026, estimated cost $15K, described as “Structural work for new roof deck (patio) at 3RD floor roof (4TH floor level) as per plans. Obtain st permit. No change in use, egress or occupancy. Note: as per NYC b.b. 2018-002, the imposed roof loads by this patio is zero. The imposed…”
- Alteration, filed May 12, 2026, estimated cost $50K, described as “Application filed for storage rooms in the cellar as well as rooftop occupancy pursuant to building bulletin 2018-002. No change in use, egress oroccupancy under this application.”
- No Work, filed Dec 26, 2023
- No Work, filed Dec 26, 2023
- Alteration, filed Nov 16, 2023, estimated cost $110K, described as “Install new HVAC units and new ducting as per attached plans. Existing cooling, heating & ventilation supply systems (cooling towers, hw boilers, heat exchanger, make-up air units) to remain. Install purging system as per plan, see sheets…”
- Alteration, filed Nov 9, 2023, estimated cost $20K, described as “Modification of existing sprinkler system by relocating, removing and installing new sprinkler heads as per plans. Obtain SP Permit. No change in use, egress or occupancy under this application. This application is filed in conjunction…”
- Alteration, filed Sep 18, 2023, estimated cost $1.3M, described as “Application is filed to convert existing commercial building into a transient lodging house with 16 sleeping room accomodations for a total of 400 beds and accessory offices as shown on plans.”
- Alteration, filed Sep 14, 2023, estimated cost $450K, described as “Install new plumbing system as per plans. Obtain pl permit. This application is filed in conjunction with the alt-co B00935173-I1 by eugene mekhtiyev, ra. (imc architecture), and a previously filed bis# 301900110, alt 1 signed off:”
- Alteration, filed Mar 11, 2022, estimated cost $20K, described as “Filing for mechanical work type to replace roof top units as per plan. No change in use, means of egress or occupancy in this application.”
- Alteration, filed Mar 2, 2022, estimated cost $90K, described as “Interior renovation in the cellar and 2ND floor as per plan. No change in use, means of egress or occupancy in this application.”
- Alteration, filed Jan 24, 2020, estimated cost $75K, described as “Install post smoke purge and emergency generator. No change in occupancy, use or egress.”
- Alteration, filed Jan 24, 2020, estimated cost $20K, described as “Fuel oil storage for diesel generator. No change of use,egress and occupancy”
Property taxes
- Assessment
- $3,818,700
- 2026–27 tax
- $366,969
- Market value (city estimate)
- $8,486,000
- Taxable value
- $3,382,830
- Assessed land
- $249,300
- Assessed improvements
- $3,569,400
Zoning
M1-4: floor area ratio 2.60 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29).
Recent sales
- Sep 14, 2023: $19,500,000
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- Variance or special permit (Board of Standards and Appeals 241-02-BZ): Variance or special permit, Denied, filed Aug 30, 2002, decided Feb 3, 2004. Variance (§72-21) to permit the proposed conversion to residential use, of two connected vacant manufacturing building, Use Group 2, located in an M2-1zoning district, that will provide 48 residential loft type units, and is contrary to…
- Gowanus Neighborhood Plan (City Planning 2018K0382): Zoning map change, Zoning text change, City map change, Urban development action area, Completed, decided Dec 6, 2021. The Gowanus Neighborhood Plan is a shared, long-term vision for a thriving neighborhood. It looks to identify strategies for an equitable, resilient and sustainable Gowanus, with more local jobs and housing. The Plan supports community…