465 Columbia Street, Brooklyn
Apartment Building · 1,836 units · built 1940 · Block 538, Lot 1.
Building permits
- Alteration, filed Nov 9, 2026, estimated cost $5K, described as “Installation of a temporary supported scaffold and heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Mar 24, 2026, estimated cost $36K, described as “Re-piping gas lines to eight (8) rooftop HVAC units and a gas stove in basement.”
- Alteration, filed Jan 15, 2026, estimated cost $100K, described as “Reconstruction of existing apartments 1A, 1B 465 columbia st. And 1C, 1E 467 columbia st. (same bin#) after completion of structural repairs in cell. Filed as subsequent document. No change in use , egress or occupancy under this…”
- Alteration, filed Nov 24, 2025, estimated cost $350K, described as “Bldg #14: temporary shoring to repair columns #9, 11, 18 as per plans.”
- Alteration, filed Nov 19, 2025, estimated cost $600K, described as “Remove and replace plumbing fixtures in kitchen and bathroom of Apt B line. Remove and replace sanitary, vent, cold water, hot water, and hot water return of Apt A line. Remove abandoned gas piping and connect new cooking ranges to…”
- Alteration, filed Aug 5, 2024, estimated cost $100K, described as “Provide replacement of existing failed underground piping as shown, provide cleaning and testing of existing piping to house main. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 31, 2024, estimated cost $400K, described as “FILING FOR EMERGENCY REPAIR - ELEVATOR PIT No change in use, egress or occupancy under this application.”
- Alteration, filed Oct 16, 2023, estimated cost $1.5M, described as “Boiler filed in conjunction with new building application 321726334.There is to be no change of use, occupancy, or egress.”
- Alteration, filed Oct 16, 2023, estimated cost $1.5M, described as “Boiler filed in conjunction with new building application 321726334.There is to be no change of use, occupancy, or egress.”
- Alteration, filed Oct 16, 2023, estimated cost $1.5M, described as “Boiler filed in conjunction with new building application 321726334.There is to be no change of use, occupancy, or egress.”
- Alteration, filed Jun 1, 2022, estimated cost $4.6M, described as “Removal of existing pavement and exterior site features. Regrading and additional fill. Construction of new ramps, new staircases; new landscaping work and site layout features including the installation of new pavement, playground…”
- Alteration, filed Jun 1, 2022, estimated cost $295K, described as “Removal of existing pavement and exterior site features. Regrading and additional fill. Construction of new ramps and staircases; new landscaping work and site layout features including the installation of new pavement, playground…”
- Alteration, filed Jun 1, 2022, estimated cost $295K, described as “Removal of existing pavement and exterior site features. Regrading and additional fill. Construction of new ramps and staircases; new landscaping work and site layout features including the installation of new pavement, playground…”
- Alteration, filed Jun 1, 2022, estimated cost $295K, described as “Removal of existing pavement and exterior site features. Regrading and additional fill. Construction of new ramps and staircases; new landscaping work and site layout features including the installation of new pavement, playground…”
- Alteration, filed Jun 1, 2022, estimated cost $295K, described as “Removal of existing pavement and exterior site features. Regrading and additional fill. Construction of new ramps and staircases; new landscaping work and site layout features including the installation of new pavement, playground…”
- Alteration, filed May 25, 2022, estimated cost $356K, described as “Removal of existing pavement and exterior site features. Regrading and additional fill. Construction of new ramps and staircases; new landscaping work and site layout features including the installation of new pavement, playground…”
- Alteration, filed May 25, 2022, estimated cost $631K, described as “Removal of existing pavement and exterior site features. Regrading and additional fill. Construction of new ramps and staircases; new landscaping work and site layout features including the installation of new pavement, playground…”
- Alteration, filed May 25, 2022, estimated cost $1.0M, described as “Removal of existing pavement and exterior site features. Regrading and additional fill. Construction of new ramps and staircases; new landscaping work and site layout features including the installation of new pavement, playground…”
- Alteration, filed May 25, 2022, estimated cost $955K, described as “Removal of existing pavement and exterior site features. Regrading and additional fill. Construction of new ramps and staircases; new landscaping work and site layout features including the installation of new pavement, playground…”
- Alteration, filed May 25, 2022, estimated cost $386K, described as “Removal of existing pavement and exterior site features. Regrading and additional fill. Construction of new ramps and staircases; new landscaping work and site layout features including the installation of new pavement, playground…”
- Alteration, filed May 25, 2022, estimated cost $295K, described as “Removal of existing pavement and exterior site features. Regrading and additional fill. Construction of new ramps and staircases; new landscaping work and site layout features including the installation of new pavement, playground…”
- Alteration, filed May 25, 2022, estimated cost $295K, described as “Removal of existing pavement and exterior site features. Regrading and additional fill. Construction of new ramps and staircases; new landscaping work and site layout features including the installation of new pavement, playground…”
- Alteration, filed May 25, 2022, estimated cost $295K, described as “Removal of existing pavement and exterior site features. Regrading and additional fill. Construction of new ramps and staircases; new landscaping work and site layout features including the installation of new pavement, playground…”
- Alteration, filed May 25, 2022, estimated cost $295K, described as “Removal of existing pavement and exterior site features. Regrading and additional fill. Construction of new ramps and staircases; new landscaping work and site layout features including the installation of new pavement, playground…”
- Alteration, filed May 16, 2022, estimated cost $356K, described as “Removal of existing pavement and exterior site features. Regrading and additional fill. Construction of new ramps and staircases; new landscaping work and site layout features including the installation of new pavement, playground…”
78 more, older permits are in this building’s full list on the map.
Building history
- Demolition, filed Apr 9, 2020, signed off Sep 3, 2021, stories 2 to 0, described as “Full demolition of two story building (bldg. 28)”
- New Building — Non-residential, filed Jan 26, 2018, permit issued - entire job/work, 3 stories
- Alteration, filed Jan 6, 2016, signed off May 25, 2018, described as “Alt 1 no work to convert day care facility (UG3) to community center (UG4) as per plans filed herewith. All work performed under application number 321168605”
- Alteration, filed Apr 11, 1996, signed off May 16, 2005, described as “Herewith filed are architectural plans f or the enlargement of struct”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $44,520,750
- Market value (city estimate)
- $98,935,000
- Taxable value
- $0
- Assessed land
- $3,649,050
- Assessed improvements
- $40,871,700
Zoning
R5: floor area ratio 1.36 built, 1.50 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, moderate risk: a 0.2% chance of flooding each year. FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NAVD88).