# 185 Van Dyke Street, Brooklyn

Industrial · built c. 1920 · Block 595, Lot 300.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/3005950300/185-van-dyke-street

More construction in Red Hook: https://umarelli.org/nyc/brooklyn/red-hook.md

Every lot on block 595: https://umarelli.org/nyc/brooklyn/595.md

## Building permits

- Alteration, filed Oct 15, 2025, estimated cost $140K, described as “Interior renovation within tenant space at Suite 213, new non-loadbearing partitions, paint, and flooring. New plumbing fixtures filed under subsequent plumbing application. No change of use, egress, or occupancy.”
- Alteration, filed Jul 15, 2025, estimated cost $15K, described as “Install new HVAC split systems as per plans. No change in use, occupancy, or egress.”
- Alteration, filed Jul 11, 2025, estimated cost $36K, described as “Install new HVAC split system, commercial kitchen exhaust vents and fans as per plans.. No change in use, occupancy or egress.”
- Alteration, filed Mar 11, 2025, estimated cost $17K, described as “Install new HVAC split systems as per plans. No change in use, occupancy or egress.”
- Alteration, filed Nov 6, 2024, estimated cost $20K, described as “Modify plumbing system as per plans. No change to use, occupancy or egress.”
- Alteration, filed Sep 26, 2024, estimated cost $20K, described as “Install new plumbing fixtures and associated piping as per plans. No change in use, occupancy, or egress.”
- Alteration, filed Jul 30, 2024, estimated cost $535K, described as “White box interior renovation of interior tenant space at unit 112, 1ST fl w/ paint & plaster repairs, floor infill repair work, and brick refinishing on the interior. New plumbing fixtures filed separately under the plumbing application.”
- Alteration, filed Jul 30, 2024, estimated cost $20K, described as “Install replacement gas piping as per plans. No change in use, occupancy, or egress.”
- Alteration, filed Jul 16, 2024, estimated cost $10K, described as “Modify existing sprinkler system as per plans. No change in use, occupancy or egress.”
- Alteration, filed Jun 20, 2024, estimated cost $40K, described as “Install HVAC split system as per plans. No change in use, occupancy or egress.”
- Alteration, filed Jun 20, 2024, estimated cost $40K, described as “Install HVAC split system as per plans. No change in use, occupancy or egress.”
- Alteration, filed Jun 20, 2024, estimated cost $20K, described as “Modify plumbing system as per plans. No change to use, occupancy or egress.”
- Alteration, filed Mar 12, 2024, estimated cost $95K, described as “Install new HVAC system & bathroom exhaust fans and vents as per plans. No change in use, occupancy or egress.”
- Alteration, filed Sep 27, 2023, estimated cost $3K, described as “Propose to install new water closet, new lavatory and one (1) new sprinkler heads in Unit 312/313. There is no proposed change in occupancy, use or egress associated with this application.”
- Alteration, filed Jun 8, 2023, estimated cost $12K, described as “4 Proposed lavatories, service sink, bar sink and drinking fountain associated with proposed Banquet hall in building segment 511 and 512 in addition to relocating 5 sprinkler heads associated with alt #321590863.”
- Alteration, filed Apr 25, 2023, estimated cost $2K, described as “8' high construction fence”
- Alteration, filed Apr 25, 2023, estimated cost $8K, described as “Interior renovation of the partial first floor of existing warehouse. Exterior work to include new store front installation and doors.”
- No Work, filed May 6, 2021
- Alteration, filed Feb 23, 2021, estimated cost $5K, described as “Herewith filing to install new fixtures in suite 111 & 112 as per the plans. No change in use, egress or occupancy.”
- Alteration, filed Dec 21, 2020, estimated cost $12K, described as “Mechanical work at existing suite 125 on ground floor and roof. No change in use, egress or occupancy in this application.”
- Alteration, filed Dec 3, 2020, estimated cost $25K, described as “Abandon existing sanitary system and connect to city sewer.”
- Alteration, filed Aug 24, 2020, estimated cost $7K, described as “Install new AC system on 1st and condenser on roof as per plans. No change in use, egress, or occupancy.”
- Alteration, filed Jul 16, 2020, estimated cost $48K, described as “Installation of the mechanical system as per plans filed herewith, no change in use, egress and occupancy.”
- Alteration, filed Mar 31, 2020, estimated cost $38K, described as “Installation of new plumbing fixtures as per the drawings filed herein.”
- Alteration, filed Feb 11, 2020, estimated cost $10K, described as “Installation of new plumbing fixtures on 1st and 2nd floors as per plans. No change in use, egress, or occupancy.”

1 more, older permit is in this building’s full list on the map: https://umarelli.org/nyc/3005950300/185-van-dyke-street.

## Building history

- Alteration, filed May 12, 2020, permit issued - entire job/work, described as “Application filed to change use &amp; occupancy of the building only as indicated on the drawings filed herein.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $6,455,700
- 2026–27 Tax: $643,048
- Market value (city estimate): $14,346,000
- Taxable value: $5,927,803
- Assessed land: $1,154,700
- Assessed improvements: $5,301,000

## Zoning

M2-1: floor area ratio 0.69 built, 2.00 allowed by base zoning.

## Recent sales

- Oct 11, 2023: $27,500,000

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 12 ft (NAVD88).

## Board and land use applications

- Red Hook Coastal Resiliency (City Planning 2021K0360): City Map Change, City Property Acquisition, Completed, filed Jul 20, 2023, decided Jun 20, 2024. The Department of Design and Construction, Department of Transportation, Department of Citywide Administrative Services, and Department of Parks and Recreation are seeking City Map amendments to regrade and elevate several streets and map…

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
