# 19 Street, Brooklyn

Commercial · built c. 1930 · Block 635, Lot 9.

On Umarelli: https://umarelli.org/nyc/3006350009/40-19-street

More construction in Sunset Park: https://umarelli.org/nyc/brooklyn/sunset-park.md

## Building permits

- New Building — Non-residential, filed Oct 31, 2022, 2 stories, described as “Construct new 2 story warehouse building as per plans filed”
- Alteration, filed Aug 17, 2026, estimated cost $3K, described as “Use of telehandler for SOE and foundation construction. This application is filed in conjunction with NB B08029013-I1”
- Alteration, filed Apr 15, 2026, estimated cost $100K, described as “Installation of temporary bracing as per plans filed herewith. This application is filed in conjunction with NB B08029013-I1.”
- Alteration, filed Jan 11, 2026, estimated cost $45K, described as “Installation of 150PSF light duty overhead protection shed as per plans. Shed shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Nov 25, 2025, estimated cost $20K, described as “Installation of construction fence for new building construction as per plans. No change in use occupancy or egress under this application. Construction fence shall comply with chapter 33 of the 2022 NYC building code.”
- Alteration, filed Mar 11, 2025, estimated cost $1K, described as “Installation of temporary needle beam as per plans. No change in use, egress or occupancy shall comply with CHAPTER#33 of 2022 the ny building code.”
- Alteration, filed Mar 10, 2025, estimated cost $40K, described as “Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Feb 25, 2025, estimated cost $10K, described as “Filing herewith non structural interior demolition application for the removal of interior sprinkler system prior to Demolition (Fed Ex). No change to use, egress, or occupancy.”
- Alteration, filed Jan 20, 2025, estimated cost $100K, described as “Application filed to remove portion of a building and construct new exterior wall - storage use to remain the same - all associated work filed filed separately.”
- Alteration, filed Jan 20, 2025, estimated cost $40K, described as “Remove interior partitions and finishes as per plans filed. no change in use egress or occupancy”
- Alteration, filed Jan 8, 2025, estimated cost $7K, described as “Install plywood construction fence for demolition operations”
- Alteration, filed Jan 8, 2025, estimated cost $10K, described as “Install plywood construction fence for demolition operations”
- Alteration, filed Nov 8, 2024, estimated cost $100K, described as “Installation of construction fence for new building construction as per plans. No change in use occupancy or egress under this application. Construction fence shall comply with chapter 33 of the 2022 NYC building code.”
- Alteration, filed Nov 7, 2024, estimated cost $83K, described as “Installation of sacrificial drilled test piles as per plans. No change in use, occupancy or egress under this application.”
- Demolition, filed Aug 27, 2024, estimated cost $80K, described as “Filing herewith plans for the demolition of a 1-story building (Verizon Outbuilding).”
- Alteration, filed Aug 16, 2024, estimated cost $3K, described as “Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed May 6, 2024, estimated cost $1K, described as “Structural filing for reconstruction of party wall”
- Alteration, filed May 6, 2024, estimated cost $1.7M, described as “General construction for wall replacement as per plans filed”
- Alteration, filed Apr 12, 2024, estimated cost $1K, described as “Site Grading for pole crib area as per plans filed”
- Demolition, filed Oct 27, 2023, estimated cost $500K, described as “Hereby filing application for the demolition of an exisiting 2-story building (e-9)”
- Alteration, filed Oct 26, 2023, estimated cost $10K, described as “Filing herewith non structural interior demolition application for the removal of interior sprinkler system prior to Demolition (Fed Ex). No change to use, egress, or occupancy.”
- Alteration, filed Oct 26, 2023, estimated cost $10K, described as “Filing herewith non structural interior demo application for the removal of the interior sprinkler system (building E-9). No change to use, egress, or occupancy.”
- Demolition, filed Oct 25, 2023, estimated cost $500K, described as “Hereby filing application for the demolition of an exisiting 1-story building (fedex building).”

## Property taxes

- Assessment: $4,412,250
- 2026–27 tax: $367,796
- Market value (city estimate): $9,805,000
- Taxable value: $3,390,450
- Assessed land: $4,334,850
- Assessed improvements: $77,400

## Zoning

M3-1: floor area ratio 0.06 built, 2.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 12 ft (NAVD88).