# 472 2nd Avenue, Brooklyn

Transportation · built 2025 · Block 662, Lot 1.

On Umarelli: https://umarelli.org/nyc/3006620001/552-2-avenue

More construction in Sunset Park: https://umarelli.org/nyc/brooklyn/sunset-park.md

## Building permits

- New Building — Non-residential, filed Jul 11, 2023, 2 stories, described as “(AS PER HUB CONSULTATION) Proposed plans and supporting documentation submitted for New Building construction of a 2-story building as per plans filed herewith.”
- Alteration, filed May 28, 2026, estimated cost $1.7M, described as “Installation of 2 temporary structures for office (B) and storage (S-2) spaces accessory to the the Marine Terminal wind farm.”
- Alteration, filed Mar 25, 2026, estimated cost $500K, described as “Installation of photovoltaic solar array on roof including all related structural work as per plans filed herewith. Electrical app# B01337971-I1 filed separately. No changeto use, egress or occupancy.”
- Alteration, filed Dec 29, 2025, estimated cost $150K, described as “MPP#000000297”
- Alteration, filed Nov 20, 2025, estimated cost $3.6M, described as “Installation of temporary structure accessory to the Marine Terminal wind power facility. Adjacent to 39th and 1st Avenue. No changes to existing structures, use or egress. Occupancy as approved by separate TUP. Under MPP# 2”
- Alteration, filed Nov 4, 2025, estimated cost $1.0M, described as “Installation temporary field office trailers with support for the south brooklyn marine terminal wind farms per plans. No change to use,egress or occupancy. Under mpp# 297”
- Alteration, filed Apr 29, 2025, estimated cost $3K, described as “Erect non-illuminated wall sign for equinor wind located at brooklyn marine terminal”
- Alteration, filed Apr 29, 2025, estimated cost $22K, described as “Erect illuminated wall sign for equinor wind located at brooklyn marine terminal”
- Alteration, filed Sep 5, 2024, estimated cost $10K, described as “Chain link fence to protect site during construction”
- Demolition, filed Mar 26, 2024, estimated cost $50K, described as “Full demolition of Bldg F- using hand held and mechanical means to assist.”
- Demolition, filed Jan 24, 2024, estimated cost $100K, described as “Full demolition of 1 story structure aka building A-J1, using full mechanical means.”
- Alteration, filed Jan 17, 2024, estimated cost $2.2M, described as “As per HUB Consultation, this application is for the installation of sacrificial test piles to facilitate pile load testing in conjunction with NB B00895541-I1. No change in use, egress or occupancy.”
- Demolition, filed Nov 24, 2023, estimated cost $100K, described as “Full demolition of one story structure aka building C-N2, using hand held and mechanical means.”
- Demolition, filed Nov 9, 2023, estimated cost $100K, described as “Full demolition of one story structure aka as building B-J2, using hand held and mechanical means.”
- Demolition, filed Nov 7, 2023, estimated cost $50K, described as “Full demolition of one story structure aka bldg E-office”
- Alteration, filed Jun 15, 2023, estimated cost $12K, described as “Temporary metal storage/filed office trailers for construction related to the south brooklyn marine terminal wind farm as per plans. No change to use,egress or occupancy.”
- Alteration, filed Sep 17, 2021, estimated cost $34K, described as “Filing as per plans for the replacement of gas piping from osp to 1 floor to roof.”
- Alteration, filed Mar 29, 2018, described as “Installation of plywood fence as per plans. No change in use, egress or occupancy.”

## Property taxes

- Assessment: $30,356,640
- Market value (city estimate): $67,459,200
- Taxable value: $0
- Assessed land: $25,294,050
- Assessed improvements: $5,062,590

## Zoning

M3-1: floor area ratio 0.09 built, 2.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NGVD29). FEMA’s preliminary map: zone VE, high risk from coastal flooding with waves: a 1% chance each year, base flood elevation 14 ft (NAVD88).

## Board and land use applications

- 241 37th Street NYPD Office Space Acquisition (City Planning 2026K0395): Completed, filed Mar 19, 2026, decided May 6, 2026. DCAS and NYPD seek to acquire office space (approximately 23, 496 square feet) at 241 37th Street (3-695-1) and 23 parking spaces (3-662-part of lot 1) for the NYPD Internal Affairs Bureau (IAB) for the operation of their Brooklyn Field…
- NYPD Office Space Acquisition- 241 37th Street (City Planning 2026K0254): Completed, filed Feb 5, 2026. A 195 Office Space Application to renew 23,496 square feet of office space is being sought by NYPD at 241 37th Street in Industry City, CD7, Brooklyn
- C-O-P INDUSTRY CITY ASSOC PKG (City Planning P2010K0130): Completed, decided Jul 1, 2010. RESTRICT DISPO OF CITY-OWNED PROPTY THROUGH LONG-TERM LEASE\*FROM SVS TO EDC FOR PARKING & ACCESSORY USE ONLY
- C-O-P/29TH ST SHED (City Planning P1998K0301): Completed, decided Dec 23, 1998. 98DBS004K: RENOVATION AND DISPOSITION OF THE 29TH STREET SHED FOR USE A S A WAREHOUSE AND DISTRIBUTION FACILITY

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
