4100 1st Avenue, Brooklyn
Pier or dock · built c. 1930 · Block 715, Lot 1.
Building permits
- No Work, filed Oct 7, 2026, described as “The MADE Show- 45 and more businesses show case”
- Alteration, filed Sep 11, 2026, estimated cost $90K, described as “Filing herewith for the installation of 2 mechanical draft fans and associated controls. There is no change to use,egress, or occupancy”
- No Work, filed Aug 27, 2026, described as “Conference for 120 persons seated at loose tables and chairs in large Ground floor lobby space at Building A of MADE Bush Terminal . Breakfast and Lunch will be served. No cooking will occur on premises.”
- No Work, filed Jun 23, 2026, described as “Temporary Place of Assembly for World Cup Watch Party at MADE Bush Terminal on June 25, 2026.”
- Alteration, filed May 5, 2026, estimated cost $90K, described as “Interior renovation of existing commercial space on the 5th floor only. architectural / construction work only”
- Alteration, filed Apr 8, 2026, estimated cost $1.0M, described as “Interior removals of partitions, ceilings, light fixtures, interior mechanical equipment and ductwork, plumbing fixtures (LAA).”
- No Work, filed Feb 20, 2026, described as “Community awareness event series with seated presentations and tabling conventions. Alternate layouts proposed daily. Open to the public with monitored entry.”
- Alteration, filed Jan 6, 2026, estimated cost $295K, described as “Herewith filing for minor general construction renovation to update tenant spaces on 2nd, 3rd, 4th, and 5th floors as per plans. No change in use egress or occupancy.”
- No Work, filed Sep 22, 2025, described as “Benefit event with cocktail receptions. For invited guests only, food and beverage served.”
- No Work, filed Jun 5, 2025, described as “Raising Health Summer Programming will have alternate layouts proposed throughout the summer, monitored entry.”
- No Work, filed Apr 21, 2025, described as “Panel discussion/ interview with audience.”
- Alteration, filed Apr 10, 2025, estimated cost $5K, described as “Installation of 300PSF sidewalk shed as per plans. Sidewalk shed shall comply with chapter 33 of NYC code 2022. No change in use, occupancy or egress under this application.”
- Alteration, filed Apr 9, 2025, estimated cost $390K, described as “Plumbing work in conjunction with provision of assembly occupancies on 1ST floor.”
- Alteration, filed Mar 28, 2025, estimated cost $9.0M, described as “Application to obtain Certificate of Occupancy for existing manufacturing building, previously renovated under job 340703288, to establish new Places of Assembly on ground floor”
- No Work, filed Feb 28, 2025, described as “Gaia Music Festival is an A3 choral event consisting of people singing in unconventional spaces. This event has no furnishings or scenic elements and is only comprised of choral singers in the space. There is no audience.”
- No Work, filed Dec 9, 2024, described as “Temporary Place of Assembly for film screening on December 13, 2024.”
- No Work, filed Dec 8, 2024, described as “Gaia Music Festival is a series of choral events. A3 event will take place in an unoccupied tenant suite at Bush Terminal and features singers singing together in the space. No audience.”
- No Work, filed Dec 6, 2024, described as “Informational event with seated presentation and cocktail mixer. For invited guests only, with food and beverages served.”
- No Work, filed Nov 28, 2024, described as “Gaia Music Festival is an A3 choral event for 499 singers max taking place in a vacant ground floor tenant suite. There is no audience, scenic elements, or furniture - singers only.”
- No Work, filed Nov 26, 2024, described as “The event will feature handmade goods and crafts from local artisans and vendors, with a focus on highlighting South Brooklyns immigrant communities. It will provide an opportunity for holiday shopping in a family-friendly environment.”
- Alteration, filed Jul 17, 2024, estimated cost $50K, described as “General construction application for demolition and restoration of the loading dock and awning as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed May 2, 2024, estimated cost $25K, described as “Storm drainage piping in conjunction with Alt-2 # 340711260 and B00251933-I1.”
- Alteration, filed Apr 11, 2024, estimated cost $30K, described as “Structural work at building b for new sump pump pit as per plans filed herewith. No change to use egress or occupancy.”
- Alteration, filed Dec 20, 2023, estimated cost $85K, described as “Filing for a temporary construction fence per plans filed herewith”
- Alteration, filed Jun 1, 2023, estimated cost $93K, described as “Landscaping work as per plans filed”
24 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $16,116,300
- Market value (city estimate)
- $35,814,000
- Taxable value
- $0
- Assessed land
- $5,418,000
- Assessed improvements
- $10,698,300
Zoning
M3-1: floor area ratio 0.94 built, 2.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 13 ft (NAVD88).
Board and land use applications
- BUSH TERMINAL-UNIT D (City Planning P2008K0315): Completed, decided Oct 20, 2008. DISPOSITION VIA EDC
- C-O-P/UNIT B BUSH TERMINAL (City Planning P1996K0252): Completed, decided Mar 4, 1997. DISPOSITION BY A LONG-TERM LEASE OF THIS 6-STORY MANUFAC-*TURING BLDG IN THE BUSH TERMINAL COMPLEX TO TANGENT INDUST-*RIES, LTD
- C-O-P/UNIT A, BUSH TERMINAL (City Planning P1996K0002): Completed, decided Mar 19, 1996. LONG TERM LEASE TO JANTON INDUSTRIES VIA ECD FOR THE*CONSOLIDATION OF THE COMPANY'S VARIOUS WOODWORKING*OPERATIONS
- UNIT A, BUSH TERMINAL (City Planning P1991K0208): Completed, decided Aug 24, 1993. NEGOTIATED LEASE OF BLDG FOR USES CONSISTENT WITH THE ZONING*RESOLUTION