# 117 42nd Street, Brooklyn

Industrial · built c. 1931 · Block 716, Lot 66.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/3007160066/117-42-street

More construction in Sunset Park: https://umarelli.org/nyc/brooklyn/sunset-park.md

Every lot on block 716: https://umarelli.org/nyc/brooklyn/716.md

## Building permits

- Alteration, filed Apr 10, 2023, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Jul 8, 2022, estimated cost $3K, described as “Install new temporary wood construction fence in front of 3 story building. Construction works as per plan. No change in egress, use, or occupancy.”
- Alteration, filed Jul 7, 2020, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed Jun 15, 2020, estimated cost $5K, described as “Subsequent filing for curb cut work type in conjunction with alt-1 application #321191562.”
- Alteration, filed Feb 14, 2020, estimated cost $1K, described as “Install new temporary wood construction fence in front of 3 story building. Construction work as per plan. No change in use, egress or occupancy.”
- Alteration, filed Sep 5, 2019, estimated cost $36K, described as “File excavation work of existing cellar in conjunction with alteration type 1 application #321191562. No change in use, egress or occupancy under this application.”

## Building history

- Alteration, filed Oct 24, 2017, permit issued - entire job/work, stories 1 to 2, described as “Horizontal extension of cellar &amp; 1ST floor, vertical extension to add 2ND and mez floors. Partition, plumbing, and structural work as per plans. Obtain new c of o.”
- Alteration, filed Jun 22, 2017, plan exam - disapproved, stories 1 to 3, described as “Horizontal extension of cellar &amp; 1ST floor, vertical extension to add 2ND and 3RD floors. Partition, plumbing, and structural work as per plans. Obtain new c of o.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $211,500
- 2026–27 Tax: $20,720
- Market value (city estimate): $470,000
- Taxable value: $191,007
- Assessed land: $38,700
- Assessed improvements: $172,800

## Zoning

M3-1: floor area ratio 1.94 built, 2.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone X, moderate risk: a 0.2% chance of flooding each year.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
