4802 1st Avenue, Brooklyn
Transportation · Block 725, Lot 1.
Building permits
- New Building — Non-residential, filed Dec 1, 2021, 7 stories, described as “This application has been accepted into the hub by rami on august 18, 2021. Please assign to a hub plan examiner. Herewith filing for a new 7 stories parking garage”
- New Building — Non-residential, filed Dec 1, 2021, 5 stories, described as “This application has been accepted into the hub by rami on august 18, 2021. Please assign to a hub plan examiner. Herewith filing new 5 stories building : tv filming studios, wardrobe storage and accessory spaces”
- New Building — Non-residential, filed Dec 1, 2021, 5 stories, described as “This application has been accepted into the hub by rami on august 18, 2021. Please assign to a hub plan examiner. Herewith filing new 8 stories building: tv filming studios, wardrobe storage and accessory spaces”
- Alteration, filed Apr 3, 2024, estimated cost $100K, described as “Erect 1400 lf of 8' high wood construction fence to enclose site.”
- Alteration, filed Feb 27, 2024, estimated cost $5K, described as “Exterior facade repairs, inboard/interior of facade wall repair, metal restoration & repair, sealant installation, roof replacement include, concrete and brick masonry restoration & repairs. No change in use, occupancy or egress.”
- Alteration, filed Feb 27, 2024, estimated cost $5K, described as “Exterior facade repairs, inboard/interior of facade wall repair, metal restoration & repair, sealant installation, roof replacement include, concrete and brick masonry restoration & repairs. No change in use, occupancy or egress.”
- Alteration, filed Nov 1, 2022, estimated cost $7.4M, described as “This application is being filed for storm and water main work. General site work (including site paving, grading, other utilities, and retaining wall) filed under separate DOB application# B00721244-I1”
- Alteration, filed Oct 18, 2022, estimated cost $362K, described as “Install new roadway, sidewalks, curbs, pavement markings, pedestrian ramps, and all other street furniture on private property”
- Alteration, filed Jul 28, 2022, estimated cost $350K, described as “Installation of underground water pipes and sewer pipes in private streets outside buildings. No change to use, egress, or occupancy.”
- Alteration, filed Jun 14, 2022, estimated cost $1K, described as “General site work including site paving, grading utilities and retaining wall construction. This application does not include storm drain or water main work.”
- Alteration, filed Jan 25, 2022, estimated cost $1K, described as “Herewith filing sprinkler/standpipe in conjunction with DOBNOW Alt. 1 # B00618008. Alt. I application is in the HUB.”
- Alteration, filed Jan 25, 2022, estimated cost $1K, described as “Herewith filing sprinkler and standpipe in conjunction with New Building # B00661139. New building application is in the HUB.”
- Alteration, filed Jan 25, 2022, estimated cost $1K, described as “Herewith filing sprinkler and standpipe system in conjunction with NB # B00616429. New building is in the HUB”
- Alteration, filed Jan 25, 2022, estimated cost $1K, described as “Herewith filing standpipe in conjunction with new building # B00629141. New Building is being reviewed in HUB.”
- Alteration, filed Jan 25, 2022, estimated cost $1K, described as “Herewith filing standpipe and sprinkler work type in conjunction with alt. 1 # B00618169. Alt. I application is in the HUB.”
- Alteration, filed Dec 28, 2021, estimated cost $1K, described as “This application has been accepted into the hub by rami on august 18, 2021. Please assign to a hub plan examiner. Herewith filing undergrouund plumbing. Filed in conjunction with NB # B00598666.”
- Alteration, filed Dec 28, 2021, estimated cost $1K, described as “This application has been accepted into the hub by rami on august 18, 2021. Please assign to a hub plan examiner. In conjunction with NB # B00629141. Herewith filing underground plumbing”
- Alteration, filed Dec 28, 2021, estimated cost $1K, described as “This application has been accepted into the hub by rami on august 18, 2021. Please assign to a hub plan examiner.herewith filing for underground plumbing in conjunction with NB # B00616429”
- Major Renovation — Non-residential, filed Dec 1, 2021, estimated cost $7.0M, 6 stories, described as “This application has been accepted into the hub by rami on august 18, 2021. Please assign to a hub plan examiner. Filing for alternation of a 6 story, non-combustiible (1-b) scenery construction, storage and accessory use building.”
- Major Renovation — Non-residential, filed Dec 1, 2021, estimated cost $7.2M, 6 stories, described as “This application has been accepted into the hub by rami on august 18, 2021. Please assign to a hub plan examiner. Filing herewithfor alternation of a 6-story, non-combustilbe (i-b), scenery construction, storage and accessory use building.”
Property taxes
- Assessment
- $13,798,350
- Market value (city estimate)
- $30,663,000
- Taxable value
- $0
- Assessed land
- $8,788,500
- Assessed improvements
- $5,009,850
Zoning
M3-1: floor area ratio 0.73 built, 2.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone VE, high risk from coastal flooding with waves: a 1% chance each year, base flood elevation 13 ft (NGVD29).
Recent sales
- Oct 20, 2022: $195,000
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- BUSH TERMINAL PIERS (City Planning P2012K0086): Completed, decided Oct 31, 2017. ESTABLISH A PUBLIC PARK BETWEEN BROOKLYN'S UPPER NY BAY & MARGINAL ST ALONG THE BUSH TERMINAL WAREHOUSES IN THE SUNSET PARK NEIGHBORHOOD OF COMMUNITY DISTRICT 7
- BUSH TERMINAL/HARBORSIDE SITE (City Planning P1997K0237): Completed, decided Oct 9, 1997. DISPOSITION BY 10-YR LEASE TO THE CURRENT YEAR TO YEAR*TENANT FOR AS-OF-RIGHT INDUSTRIAL/WAREHOUSE USES TOTALLING*APPROX 834,000SF IN SEVERAL BLDGS ALONG THE WATERFRONT
- SUNSET PARK SLUDGE FACILITY (City Planning P1993K0072): Completed, decided Feb 19, 1993. SITE SELECTION TO CONSTRUCT A SLUDGE PROCESSING FACILITY IN*RESPONSE TO THE OCEAN DUMPING BAN ACT OF 1988