1 Avenue, Brooklyn
Utility · Block 725, Lot 100.
Building permits
- New Building, filed Jul 13, 2022, 1 story, described as “This application has been accepted into the hub by rami on august 18, 2021. Please assign to a hub plan examiner. Herewith filiing NB for non-combustible electric utility substation with no occupancy as per plans”
- New Building — Non-residential, filed Dec 1, 2021, 5 stories, described as “This application has been accepted into the hub by rami on august 18, 2021. Please assign to a hub plan examiner. Herewith filing new 8 stories building: tv filming studios, wardrobe storage and accessory spaces”
- New Building — Non-residential, filed Dec 1, 2021, 5 stories, described as “This application has been accepted into the hub by rami on august 18, 2021. Please assign to a hub plan examiner. Herewith filing new 5 stories building : tv filming studios, wardrobe storage and accessory spaces”
- Alteration, filed Apr 3, 2024, estimated cost $100K, described as “Erect 1400 lf of 8' high wood construction fence to enclose site.”
- Alteration, filed Jun 14, 2022, estimated cost $1K, described as “General site work, grading, and site utility installation. in conjunction with NB application # B00714355”
- Alteration, filed Jan 25, 2022, estimated cost $1K, described as “Herewith filing sprinkler and standpipe system in conjunction with NB # B00616429. New building is in the HUB”
- Alteration, filed Jan 25, 2022, estimated cost $1K, described as “Herewith filing sprinkler and standpipe in conjunction with New Building # B00661139. New building application is in the HUB.”
- Alteration, filed Dec 28, 2021, estimated cost $1K, described as “This application has been accepted into the hub by rami on august 18, 2021. Please assign to a hub plan examiner.herewith filing for underground plumbing in conjunction with NB # B00616429”
- Alteration, filed Dec 28, 2021, estimated cost $1K, described as “This application has been accepted into the hub by rami on august 18, 2021. Please assign to a hub plan examiner. Herewith filing undergrouund plumbing. Filed in conjunction with NB # B00598666.”
Zoning
M3-1: floor area ratio 0.00 built, 2.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone X, moderate risk: a 0.2% chance of flooding each year.
Board and land use applications
- BUSH TERMINAL/HARBORSIDE SITE (City Planning P1997K0237): Completed, decided Oct 9, 1997. DISPOSITION BY 10-YR LEASE TO THE CURRENT YEAR TO YEAR*TENANT FOR AS-OF-RIGHT INDUSTRIAL/WAREHOUSE USES TOTALLING*APPROX 834,000SF IN SEVERAL BLDGS ALONG THE WATERFRONT
- SUNSET PARK SLUDGE FACILITY (City Planning P1993K0072): Completed, decided Feb 19, 1993. SITE SELECTION TO CONSTRUCT A SLUDGE PROCESSING FACILITY IN*RESPONSE TO THE OCEAN DUMPING BAN ACT OF 1988