4708 5th Avenue, Brooklyn
Commercial · built c. 1923 · Block 765, Lot 38.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Jan 8, 2024, estimated cost $75K, described as “Replace & Install new wood joists,decking,concrete at 1st & under 1st fl.due to damage.replace steel, metal decking & concrete over vault,new steel members, metal deck & concrete floor to infill 2nd floor opening, new steel framing over…”
- Alteration, filed Nov 29, 2023, estimated cost $2K, described as “Illuminated non-advertising accessory wall sign - oak st. Health. No change of use, egress or occupancy.”
- Alteration, filed Oct 25, 2023, estimated cost $173K, described as “Mechanical work associated with proposed tenant OSH”
- Alteration, filed Oct 25, 2023, estimated cost $95K, described as “Sprinkler work for new Tenant OSH - Install (58) sprinkler heads on 1st floor, Install (45) sprinkler heads on 2nd Floor.. all work with associated piping to cellar fire service main. Existing sprinkler heads in cellar to remain”
- Alteration, filed Oct 25, 2023, estimated cost $161K, described as “Proposing Plumbing Work associated with new tenant space for OSH -(6) water closets, (6) Lavs., (4) Drinking Fountains, (16) non residential sinks, (13) drains, (1) dishwasher (2) RPZ, (1) DCDA ,(1) Hot Water Heater - all with assoc.…”
- Alteration, filed Oct 25, 2023, estimated cost $1.4M, described as “Renovation of existing building and change from UG6 retail to UG6 Business-Healthcare facility. Work to include new storefront, interior partitions, finishes and casework. All work as per plans.”
- Alteration, filed Sep 27, 2023, estimated cost $2K, described as “Removal of plumbing fixtures on the 1st Floor to include (3) water closets and (3) toilets.”
- Alteration, filed Sep 27, 2023, estimated cost $58K, described as “Proposing removal/demo of interior partitions, storefront, interior stairway, finishes and removal of mechanical units on roof. All work as per plans”
- Alteration, filed Sep 21, 2023, estimated cost $10K, described as “Install a Construction Fence during work at site for Storefront and other associated construction. to building.”
Building history
- Alteration, filed Jul 11, 1991, signed off May 6, 1996, described as “Changes to plans. Umbing fixtures, elvator shaft, open wal l at cellar, first second fls replace s orefront, install fence, install partiti ons. Transfer floor area of demolished hird floor to existing one story portion to make two story…”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $724,950
- 2026–27 Tax
- $48,342
- Assessed land
- $21,600
- Assessed improvements
- $703,350
Zoning
C4-3A: floor area ratio 2.00 built, 3.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.