# 4923 2nd Avenue, Brooklyn

Hotel · built 2019 · Block 781, Lot 1.

On Umarelli: https://umarelli.org/nyc/3007810001/4923-2-avenue

More construction in Sunset Park: https://umarelli.org/nyc/brooklyn/sunset-park.md

Every lot on block 781: https://umarelli.org/nyc/brooklyn/781.md

## Building permits

- Alteration, filed Apr 23, 2026, estimated cost $28K, described as “Installation of a new emergency generator with 60 gallon belly tank perk plans submitted herewith.”
- Alteration, filed Apr 23, 2026, estimated cost $4K, described as “Installation of a 60 gallon belly tank serving a 55KW generator”
- Alteration, filed Apr 8, 2025, estimated cost $25K, described as “Installation of temporary needle beam as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Apr 8, 2025, estimated cost $45K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Aug 5, 2024, estimated cost $15K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Feb 9, 2018, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”

## Property taxes

- Assessment: $2,293,650
- 2026–27 tax: $246,150
- Market value (city estimate): $5,097,000
- Taxable value: $2,269,080
- Assessed land: $450,900
- Assessed improvements: $1,842,750

## Zoning

M1-2D: floor area ratio 5.76 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Feb 25, 2016: $2,150,000

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Extension to finish construction (Board of Standards and Appeals 2022-3-BZY): Extension to finish construction, Granted, filed Jan 13, 2022, decided Jul 10, 2023. Extension of time (§11-332) to complete construction of a minor development commenced under the prior zoning. M1-2D zoning district

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology