329 50th Street, Brooklyn
Apartment building · 48 units · built c. 1924 · Block 782, Lot 56.
Building permits
- Alteration, filed Aug 19, 2024, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Jun 25, 2024, described as “Suspended scaffold out rigger system for facade repair works and inspections.”
- Alteration, filed Jun 14, 2024, estimated cost $1K, described as “Proposed installation of temporary light duty pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Apr 12, 2023, estimated cost $15K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Apr 12, 2023, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Apr 12, 2023, estimated cost $15K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Apr 12, 2023, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Jul 11, 2022, estimated cost $307K, described as “Exterior restoration as per plans filed herewith. No change in use, egress or occupancy”
- Alteration, filed Jul 11, 2022, estimated cost $307K, described as “Exterior restoration work as per plans filed herewith. No change in use, egress or occupancy”
- Alteration, filed Apr 22, 2022, estimated cost $150K, described as “Installation of pipe insulation, valve replacements and boiler controls as per plans filed herewith. no change, use, egress or occupancy”
- Alteration, filed Apr 22, 2022, estimated cost $300K, described as “Installation of new water heater, rpz, replacing 51 plumbing fixtures, and associated piping and insulation. no change, in use egress or occupancy”
- Alteration, filed Apr 22, 2022, estimated cost $350K, described as “Plumbing modification as per plans filed herewith. no change, in use, egress or occupancy”
- Alteration, filed Apr 22, 2022, estimated cost $20K, described as “Replacement of existing carlin oil burner with dual fuel burner as per plans filed herewith. no change in use, egress or occupancy”
- Alteration, filed Apr 22, 2022, estimated cost $150K, described as “Mechanical work as per plans filed herewith. no change, in use egress or occupancy”
- Alteration, filed Apr 14, 2022, estimated cost $1.3M, described as “General construction work as per plans including new windows & doors, minor apt and public area reno, direct replacement of plumbing fixtures. New finishes. No change, in use, egress or occupancy.”
- Alteration, filed Apr 14, 2022, estimated cost $1.4M, described as “General construction work as per plans filed herewith. No change, in use, egress or occupancy”
- Alteration, filed Mar 23, 2021, estimated cost $6K, described as “Installation of heavy duty sidewalk shed as per plans. No change in use occupancy or egress under this application. Sidewalk shed shall comply with chapter 33 of the 2014 NYC building code.”
- Alteration, filed Jan 25, 2019, estimated cost $8K, described as “Installation of heavyduty sidewalk shed for remedial repairs. No change in use occupancy or egress under this application. Sidewalk shed filed under separate application.”
Property taxes
- Assessment
- $1,154,700
- Market value (city estimate)
- $2,566,000
- Taxable value
- $0
- Assessed land
- $111,150
- Assessed improvements
- $1,043,550
Tax breaks
- Article XI exemption, through Jun 30, 2027, about $143,633 a year below the full tax.
Zoning
R6B: floor area ratio 2.77 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- AGENCY OPERATED BOARDING HOME (City Planning P2000K0310): Completed, decided Jan 11, 2001. ACQUISITION OF A 6-ROOM APT TO CONTINUE TO BE USED AS A*BOARDING HOME FOR 3 FEMALES AGES 16-21