4917 4th Avenue, Brooklyn
House of worship · built c. 1931 · Block 783, Lot 1.
Building permits
- Alteration, filed Jan 14, 2026, estimated cost $1K, described as “Installation of temporary construction fence as per plans. No change in use, occupancy or egress.”
- Alteration, filed Nov 24, 2025, estimated cost $136K, described as “Filing herewith plumbing work on existing Cellar, 1st & 2nd floor space. No change in use, egress or occupancy.”
- Alteration, filed Nov 11, 2025, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”
- Alteration, filed Oct 30, 2025, estimated cost $620K, described as “Filing herewith mechanical work on existing Cellar, 1st & 2nd floor space. No change in use, egress or occupancy.”
- Alteration, filed Jul 14, 2025, estimated cost $300K, described as “Filing herewith sprinkler work on existing CEL, 1st, 2nd floor space, ST. ANDREW'S CHURCH. No change in use, egress or occupancy.”
- Alteration, filed Feb 20, 2025, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Nov 22, 2024, estimated cost $1K, described as “Installation of temporary knee bracket as per plans. No change in use, egress or occupancy shall comply with CHAPTER#33 of 2022 the ny building code.”
- Alteration, filed Aug 1, 2024, estimated cost $180K, described as “Filing herewith partial soft removal of the front facade and bell tower. No change in use, egress or occupancy.”
- Alteration, filed Jul 26, 2024, estimated cost $100K, described as “Filing herewith structural work in conjunction with ALT 1 filing B01019225-I1 church restoration, on existing roof, first and second floor space. No change in use, egress or occupancy.”
- Alteration, filed Mar 25, 2024, estimated cost $1.8M, described as “Filing herewith int. Alteration & ext restoration of existing church offices bathrooms vertical circulation to be altered in int. Masonry windows roof & waterproofing to be restored in ext. Existing non compliance building. No bulk…”
- Alteration, filed Jan 19, 2024, estimated cost $328K, described as “Interior alteration of an existing church. Finishes and non-load bearing partitions to be removed. No change in use, occupancy or egress.”
- Alteration, filed Nov 29, 2022, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”
Property taxes
- Assessment
- $633,600
- 2026–27 tax
- $65,550
- Market value (city estimate)
- $1,408,000
- Taxable value
- $604,260
- Assessed land
- $107,100
- Assessed improvements
- $526,500
Zoning
R7A: floor area ratio 1.61 built, 4.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- St Andrew’s Community Day Care Center (cont use) (City Planning P2015K0376): Completed, decided Apr 30, 2018. This is an application by the Administration for Children's Services (ACS) and Department of Citywide Administrative Services (DCAS) requesting approval for acquisition (lease renewal) of property for the continued use as a childcare…
- ST ANDREWS DCC (City Planning P1991K0412): Completed, decided Oct 17, 1994. ACQUISITION OF THE 1ST FLOOR OF BLDG TO CONTINUE TO OPERATE*A CENTER FOR 35 CHILDREN
- ST ANDREWS DAY CARE CENTER (City Planning P1986K0815): Completed, decided Dec 18, 1986. LEASE FOR ENROLLMENT OF 37 CHILDREN