# 5102 5th Avenue, Brooklyn

Mixed use · 4 units · built c. 1931 · Block 799, Lot 37.

On Umarelli: https://umarelli.org/nyc/3007990037/5102-5-avenue

More construction in Sunset Park: https://umarelli.org/nyc/brooklyn/sunset-park.md

Every lot on block 799: https://umarelli.org/nyc/brooklyn/799.md

## Building permits

- Alteration, filed Jan 7, 2025, estimated cost $4K, described as “Erect illuminated accessory business wall sign; copy reading "bank of america with flag logo"”
- Alteration, filed Jan 7, 2025, estimated cost $4K, described as “Erect illuminated accessory business wall sign; copy reading "bank of america with flag logo"”
- Alteration, filed Dec 3, 2024, estimated cost $535K, described as “Tenant fit out for Bank of America in conjunction with ALT 1 application# B00921833-I1 . No change to use, egress or occupancy.”
- Alteration, filed Sep 19, 2024, estimated cost $3K, described as “Installation of temporary construction fence as per plans filed herewith.”
- Alteration, filed Sep 19, 2024, estimated cost $3K, described as “Installation of temporary construction fence as per plans filed herewith.”
- Alteration, filed Mar 5, 2024, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Mar 4, 2024, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Mar 4, 2024, estimated cost $1K, described as “Proposed installation of temporary light duty pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Jan 23, 2024, estimated cost $60K, described as “Structural work as per plans filed herewith. Filed in conjunction with ALT1 application B00921833 and related structural application B00916011. No change to use, egress or occupancy.”
- Alteration, filed Oct 6, 2023, estimated cost $35K, described as “Installation of mechanical systems”
- Alteration, filed Oct 6, 2023, estimated cost $20K, described as “Installation of sprinkler systems”
- Alteration, filed Oct 6, 2023, estimated cost $25K, described as “Installation of plumbing fixtures”
- Alteration, filed Aug 30, 2023, estimated cost $30K, described as “The scope of work is to add new pad footings for new steel posts and enlarge wall footing. ALT1 to combine buildings 5102 and 5106 5th avenue filed under separate application B00917597. Structural work filed under separate application…”
- Alteration, filed Aug 30, 2023, estimated cost $150K, described as “Add openings in existing party wall, add steel framings and new stair openings and infill existing stair opening. ALT1 to combine buildings 5102 and 5106 5th Ave and FO work filed under separate application”
- Alteration, filed Aug 25, 2023, estimated cost $800K, described as “This project includes an alt i building renovation andcombination of exisitng two buildings (5102 5TH ave and 5106 5TH ave) into one building (5102 5TH avenue).”
- Alteration, filed Jul 23, 2023, estimated cost $28K, described as “Interior demolition on 2ND and 3RD as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed May 26, 2023, estimated cost $55K, described as “Selected removals and related general construction alterations on 1ST floor as per plans filed herewith.”
- Alteration, filed May 1, 2023, estimated cost $200K, described as “Interior renovation and related general construction alterations on 2ND floor through 4TH floor and exterior facade work.”
- Alteration, filed Mar 31, 2023, estimated cost $165K, described as “Selected removals and related general construction alterations on the 2ND thru 4TH floors. No change to use, egress or occupancy.”

## Property taxes

- Assessment: $1,281,600
- 2026–27 tax: $135,006
- Market value (city estimate): $2,848,000
- Taxable value: $1,244,520
- Assessed land: $118,800
- Assessed improvements: $1,162,800

## Zoning

C4-3A: floor area ratio 2.65 built, 3.00 allowed by base zoning.

## Recent sales

- Nov 22, 2022: $4,400,000

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
