150 52nd Street, Brooklyn
Industrial condominium · built c. 1918 · Block 804, Lot 7501.
Building permits
- Alteration, filed Sep 14, 2026, estimated cost $20K, described as “Application filed to install split ac system units for existing commercial space at second floor bathroom and roof as per plans. No change to use, egress, or occupancy.”
- Alteration, filed Sep 1, 2026, estimated cost $99K, described as “Change of egress and change of use @ 1st floor as shown on plans.”
- Alteration, filed Aug 3, 2026, estimated cost $459K, described as “Tenant improvement work for a space located on the ground floor. Proposed work includes new interior partitions, ceilings, flooring, millwork and related services as shown on submitted plans. No change in occupancy, use or egress.”
- Alteration, filed Nov 4, 2025, estimated cost $1K, described as “Filing to obtain certificates of compliance for existing mechanical equipment approved, installed and signed off under MS #B00374394-I1. No new work being performed under this application. Filing for certificates of compliance only.”
- Alteration, filed Oct 3, 2023, estimated cost $125K, described as “Flied to renovate existing ramp and entry stairs to accommodate city harvest accessory offices, assembly areas, food donation, storage. Filed per approved revocable consent drawings (filed under separate DOT application)”
- Alteration, filed Mar 9, 2023, estimated cost $924, described as “Erect a non-illuminated business accessory ground sign on existing supports. No change in use, egress, or occupancy.”
- Alteration, filed Mar 9, 2023, estimated cost $3K, described as “Erect a non-illuminated business accessory ground sign on existing supports. No change in use, egress, or occupancy.”
- Alteration, filed Mar 9, 2023, estimated cost $1K, described as “Erect a non-illuminated business accessory wall sign. No change in use, egress, or occupancy.”
- Alteration, filed Mar 9, 2023, estimated cost $3K, described as “Erect a non-illuminated business accessory wall sign. No change in use, egress, or occupancy.”
- Alteration, filed Mar 9, 2023, estimated cost $3K, described as “Erect a non-illuminated business accessory ground sign on existing supports. No change in use, egress, or occupancy.”
- Alteration, filed Nov 22, 2022, estimated cost $8K, described as “Erect an illuminated business accessory sign on approved canopy #B08006599. No change in use, egress, or occupancy.”
- Alteration, filed Nov 22, 2022, estimated cost $1K, described as “Erect a non-illuminated business accessory sign on approved canopy #B08006599. No change in use, egress, or occupancy.”
- Alteration, filed Nov 22, 2022, estimated cost $1K, described as “Erect a non-illuminated business accessory sign on approved canopy #B08006599. No change in use, egress, or occupancy.”
- Alteration, filed Nov 22, 2022, estimated cost $3K, described as “Erect an illuminated business accessory sign on approved canopy #B08006599. No change in use, egress, or occupancy.”
- Alteration, filed Sep 28, 2022, estimated cost $700K, described as “Awning structural drawings and details, no change in use egress or occupancy”
- No Work, filed Mar 1, 2022
- Alteration, filed Jan 26, 2022, estimated cost $150K, described as “This scope of work contains the proposed structural renovations including the addition of steelframing at various locations”
- Alteration, filed Jan 18, 2022, estimated cost $250K, described as “The scope of this filing is the plumbing infrastructure and connections to kitchen equipment and appliances. Kitchen equipment will have natural gas, domestic cold and hot water, direct sanitary, indirect waste and vent connections. New…”
- Alteration, filed Dec 20, 2021, estimated cost $44K, described as “Erect an illuminated business accessory wall sign. No change in use, egress, or occupancy.”
- Alteration, filed Dec 20, 2021, estimated cost $44K, described as “Erect an illuminated business accessory wall sign. No change in use, egress, or occupancy.”
- Alteration, filed Nov 29, 2021, estimated cost $1K, described as “Installation of temporary work platform as per plan. No change in use,egress or occupancy.”
- Alteration, filed Sep 23, 2021, estimated cost $1K, described as “Installation of temporary barricade as per plan. No change in use,egress or occupancy.”
- Alteration, filed Sep 23, 2021, described as “Installation of temporary system stair tower as per plan. No change in use, egress or occupancy.”
- Alteration, filed Sep 23, 2021, described as “Installation of temporary sidewalk shed as per plan. No change in use,egress or occupancy.”
- Alteration, filed Sep 23, 2021, described as “Installation of temporary plywood fence as per plan. No change in use, egress or occupancy.”
23 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $7,265,700
- 2026–27 tax
- $726,984
- Market value (city estimate)
- $16,146,000
- Taxable value
- $6,701,550
- Assessed land
- $1,134,900
- Assessed improvements
- $6,130,800
- Condo units with their own tax lots
- 2
Zoning
M3-1: floor area ratio 1.19 built, 2.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.