5202 3rd Avenue, Brooklyn
Industrial · built 2004 · Block 805, Lot 45.
Building permits
- Alteration, filed Jul 23, 2025, estimated cost $950, described as “Install exterior illuminated wall sign (ferguson)”
- Alteration, filed Jul 23, 2025, estimated cost $950, described as “Install exterior illuminated wall sign (ferguson)”
- Alteration, filed May 16, 2025, estimated cost $86K, described as “Filing for installation of free-standing racks within existing warehouse. No change to use, egress, bulk, or occupancy.”
- Alteration, filed Feb 3, 2025, estimated cost $75K, described as “Filing herewith for interior renovation of an existing commercial space per plans attached. There is no change in use, occupancy or egress.”
- Alteration, filed Jan 27, 2025, estimated cost $35K, described as “Herewith filing for removal of masonry facade members to create opening per plans. No change in use, occupancy or egress under this application.”
- Alteration, filed Oct 31, 2022, estimated cost $10K, described as “412K - Herewith filing additional sprinkler work type for tenant fit-out to include additional sprinkler heads.”
- Alteration, filed Dec 8, 2021, estimated cost $175K, described as “412K - Herewith filing sprinkler work type for tenant fit-out.”
- Alteration, filed Dec 8, 2021, estimated cost $566K, described as “412K - Herewith filing Mechanical work type for tenant fit-out.”
- Alteration, filed Dec 8, 2021, estimated cost $360K, described as “412K - Herewith filing Plumbing work type for tenant fit-out space.”
- Alteration, filed Dec 8, 2021, estimated cost $4.5M, described as “Herewith filing tenant fitout space for PS 412K”
- Alteration, filed Nov 17, 2021, estimated cost $80K, described as “Herewith filing for structural work in conjunction with interior stair modifications per plans. No change in use, occupancy or egress under this application.”
- Alteration, filed Nov 3, 2021, estimated cost $50K, described as “Herewith filing for relocation and installation of sprinkler heads based on new stairwell and for new connections to the existing system per plans.”
- Alteration, filed Nov 3, 2021, estimated cost $40K, described as “Herewith filing for installation of a new gas meter and associated piping and the relocation of an existing dcw line per plans”
- Alteration, filed Nov 1, 2021, estimated cost $260K, described as “Herewith filing for modifications to interior stairs per plans. No change in use, occupancy or egress under this application.”
- Alteration, filed Jan 22, 2020, estimated cost $1K, described as “Install non-illuminated sign on wall. (cooper electric)”
- Alteration, filed Jan 22, 2020, estimated cost $2K, described as “Install non-illuminated sign on wall. (cooper electric)”
- Alteration, filed Jan 22, 2020, estimated cost $1K, described as “Install non-illuminated sign on wall. (cooper electric)”
- Alteration, filed Mar 19, 2019, estimated cost $4K, described as “Install non-illuminated mesh banner sign on wall (cooper electric supply co)”
- Alteration, filed Mar 19, 2019, estimated cost $4K, described as “Install non-illuminated mesh banner sign (cooper electric supply co.)”
- Alteration, filed Apr 4, 2018, estimated cost $5K, described as “Install non-illuminated sign on wall. (cooper electric supply co.)”
- Alteration, filed Apr 4, 2018, estimated cost $3K, described as “Install non-illuminated sign on wall (cooper electric supply co.)”
- Alteration, filed Apr 4, 2018, estimated cost $3K, described as “Install non-illuminated sign on wall. (cooper electric supply co.)”
Property taxes
- Assessment
- $2,538,900
- 2026–27 tax
- $175,357
- Market value (city estimate)
- $5,642,000
- Taxable value
- $1,616,490
- Assessed land
- $468,450
- Assessed improvements
- $2,070,450
Tax breaks
- ICAP/ICIP exemption, through Jun 30, 2030, about $51,823 a year below the full tax.
Zoning
M1-2D: floor area ratio 2.97 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.