# 5201 7th Avenue, Brooklyn

Commercial · built c. 1899 · Block 810, Lot 10.

On Umarelli: https://umarelli.org/nyc/3008100010/5201-7-avenue

More construction in Sunset Park: https://umarelli.org/nyc/brooklyn/sunset-park.md

Every lot on block 810: https://umarelli.org/nyc/brooklyn/810.md

## Building permits

- Alteration, filed Sep 28, 2023, estimated cost $3K, described as “Installation of an illuminated business accessory sign . No change in use, egress or occupancy.”
- Alteration, filed Jul 10, 2023, estimated cost $80K, described as “Interior cosmetic renovation of existing business office at 004 , no changei n use, egress or occupancy”
- Alteration, filed Aug 12, 2021, estimated cost $40K, described as “Installation of non-emergency natural gas generator on the roof floor with new gas piping and gas meter.no change in use,egress and occupancy.”
- Alteration, filed Dec 16, 2020, estimated cost $8K, described as “Alteration type 3 - construction equipment - scaffolding installation of pipe scaffold as per plans. Pipe scaffold shall comply withchapter 33 of the NYC building code. No change in use, egress or occupancy.”
- Alteration, filed Dec 15, 2020, estimated cost $8K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code. No change in use occupancy or egress under this application.”
- Alteration, filed Sep 22, 2020, estimated cost $50K, described as “Install fuel storage tank, pump, piping and emergency generator for 4 stories commercial building filed in conjunction with job A1#321594360. No change to use, occupancy or egress.”
- Alteration, filed Jul 12, 2020, estimated cost $11K, described as “Alteration type 3 - construction equipment - sidewalk-shed installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code.”
- Alteration, filed Apr 18, 2020, estimated cost $352K, described as “Proposed structural work in conjunction with alt 1 APPLICATION#321594360. No change in use, egress, or occupancy.”
- Alteration, filed Apr 8, 2020, estimated cost $147K, described as “Filing plumbing work in conjunction with application# 321594360. no change in use, egress, or occupancy.”
- Alteration, filed Mar 19, 2020, estimated cost $63K, described as “Filing sprinkler work in conjunction with APPLICATION#321594360. No change in use, egress, or occupancy.”
- Alteration, filed Mar 19, 2020, estimated cost $88K, described as “Filing mechanical system work in conjunction with job#321594360. no change in use, egress, or occupancy.”
- Alteration, filed Dec 13, 2019, estimated cost $5K, described as “Proposed to install 8' high temporary plywood construction fence in conjunction with application #321594360. No change in use, egress, or occupancy.”

## Property taxes

- Assessment: $737,550
- 2026–27 tax: $9,959
- Market value (city estimate): $1,639,000
- Taxable value: $733,506
- Assessed land: $50,850
- Assessed improvements: $686,700

## Tax breaks

- ICAP abatement, through Jun 30, 2049, a $69,612 credit this tax year.

## Zoning

R7A: floor area ratio 5.00 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Jun 14, 2019: $3,100,000
- Sep 28, 2016: $3,100,000

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
