# 170 53rd Street, Brooklyn

Industrial · built c. 1925 · Block 812, Lot 26.

On Umarelli: https://umarelli.org/nyc/3008120026/170-53-street

More construction in Sunset Park: https://umarelli.org/nyc/brooklyn/sunset-park.md

Every lot on block 812: https://umarelli.org/nyc/brooklyn/812.md

## Building permits

- Alteration, filed Feb 4, 2025, estimated cost $6K, described as “Herewith filing for an interior renovation for floor # 002. No change to use, occupancy or egress.”
- Alteration, filed Apr 6, 2022, estimated cost $225K, described as “Installation of heating/air conditioning system and ventilation system at existing commercial space on floor 001. Mechanical work. There is to be no change of use, occupancy, or egress.”
- Alteration, filed Apr 6, 2022, estimated cost $86K, described as “Plumbing and sprinkler work in conjunction with interior renovation of the ground floor of an existing 3-story factory office building. No change in use, occupancy, or egress.”
- No Work, filed Oct 16, 2019, described as “Indoor concert/ dance with food and drink ( no cooking on premise) for total of 1,950 people on first floor.”
- No Work, filed Aug 20, 2019, described as “Caribbean Cultural Event with performing artist”
- No Work, filed May 31, 2019, described as “Boina Olam fundraising dinner, on first floor only”
- No Work, filed May 13, 2019, described as “TPA is for a 998 person occupancy musical performance on Saturday, May 25th. Start time is noon and the event ends at 10pm. Toilets provided. Exits provided beyond requirements. Food and beverages to be served. No open flame.”
- No Work, filed Jan 30, 2019, described as “TCE 2019 Presents- series of dance events with food and beverages for ticket persons only. Maximum 2300 persons. Event Schedule: February 09th- February 10th: 10PM- 7AM (Saturday); February 15th- February 16th: 10PM- 7AM (Friday)”
- Alteration, filed Dec 11, 2018, estimated cost $81K, described as “Filing for standpipe and sprinkler head installation in association with alt 1 application #321816442.”
- Alteration, filed Nov 15, 2018, estimated cost $120K, described as “Filing for sprinkler work type”

## Property taxes

- Assessment: $9,038,700
- 2026–27 tax: $807,616
- Market value (city estimate): $20,086,000
- Taxable value: $7,640,730
- Assessed land: $1,012,500
- Assessed improvements: $8,026,200

## Tax breaks

- Abatement (city code CERP), through Apr 30, 2035, a $21,250 credit this tax year.

## Zoning

M3-1: floor area ratio 2.51 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
