# 5501 1st Avenue, Brooklyn

Hospital · built c. 1931 · Block 828, Lot 1.

On Umarelli: https://umarelli.org/nyc/3008280001/5501-1-avenue

More construction in Sunset Park: https://umarelli.org/nyc/brooklyn/sunset-park.md

Every lot on block 828: https://umarelli.org/nyc/brooklyn/828.md

## Building permits

- Alteration, filed Nov 13, 2026, estimated cost $9.4M, described as “Renovate patient rooms/corridors on 5th floor: new ceilings, radiant panels, flooring, wall finishes/protection, millwork, toilet room finishes/fixtures, window gaskets, and new roof exhaust fans w/ curbs. No change to use, egress, or…”
- Alteration, filed Oct 26, 2026, estimated cost $500K, described as “Herein filed to record the temporary placement, installation, and use of three (3)prefabricated mobile modular units, consisting of two (2) kitchen trailers and one (1)cooler trailer. No change in use egress or occupancy.”
- Alteration, filed Oct 13, 2026, estimated cost $2.0M, described as “Nyu mri expansion renovation - general construction modifications as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Sep 21, 2026, estimated cost $190K, described as “Nyu nuclear camera replacement - general construction modifications as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Sep 16, 2026, estimated cost $30K, described as “Installation of a temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Sep 16, 2026, estimated cost $15K, described as “Installation of a temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application”
- Alteration, filed Jul 14, 2026, estimated cost $1.1M, described as “Nyu - 150 55TH street - 2 new boilers on first floor as per plans filed herewith. No changes in use, egress, or occupancy.”
- Alteration, filed Jun 28, 2026, estimated cost $600K, described as “Nyulh brooklyn - mri expansion P1 - general construction including modifications to existing floors, partitions, ceilings and doors as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed May 19, 2026, estimated cost $1.6M, described as “Brooklyn Hospital - Interior modifications on partial 1st floor as shown on plans filed herewith. No change in egress, occupancy or use.”
- Alteration, filed Mar 27, 2026, estimated cost $3.5M, described as “Nyu - coronary - general construction as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Mar 27, 2026, estimated cost $125K, described as “Nyulh brooklyn - kitchen upgrades package a & b - general construction including modifications to existing floors, partitions, ceilings and doors as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Mar 27, 2026, estimated cost $125K, described as “Nyulh brooklyn - kitchen upgrades package c - general construction including modifications to existing floors, partitions, ceilings and doors as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Mar 5, 2026, estimated cost $200K, described as “Nyulh brooklyn - tb room - general construction including modifications to existing floors, partitions, ceilings and doors as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Feb 5, 2026, estimated cost $90K, described as “Nyulh brooklyn hospital - interior modifications to 3RD floor radiography reading room &storage as shown on plans filed herewith. No change in egress, occupancy, or use.”
- Alteration, filed Dec 17, 2025, estimated cost $1.0M, described as “Nyulh brooklyn - 3500 oncology beds - general construction including modifications to existing floors, partitions, ceilings and doors as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Dec 2, 2025, estimated cost $100K, described as “Nyu - emergency branch separation - interior modifications according to plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Nov 21, 2025, estimated cost $65K, described as “Sprinkler modifications as indicated on the plans filed herewith. No change in use, egress or occupancy”
- Alteration, filed Nov 12, 2025, described as “Installation of suspended scaffold for facade work or inspection.”
- No Work, filed Oct 20, 2025
- Alteration, filed Sep 3, 2025, estimated cost $1.0M, described as “General construction modifications to the interior fit out portions of the 2ND floor to accomadate cpep area including closing off an existing entrance and cretaing new fenestration on the exterior envelope. No change in use, egress or…”
- Alteration, filed Aug 4, 2025, estimated cost $46K, described as “Sprinkler modifications as indicated on the plans filed herewith. No change in use, egress or occupancy”
- Alteration, filed Aug 1, 2025, estimated cost $267K, described as “Interior modification of partitions and finishes to accomodate alterations within the existing hospital building as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 18, 2025, estimated cost $50K, described as “Temporary trolley beam system as per drawings during bldg alteration, filed sep. Trolley beam system shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jun 18, 2025, estimated cost $50K, described as “Temporary pipe scaffold as per drawings. Scaffold shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed May 31, 2025, estimated cost $480K, described as “Nyu lutheran hospital brooklyn fire alarm closet upgrade - general construction associated with fire alarm upgrade as per plans filed herewith. No change in use, egeress, or occupancy.”

113 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/3008280001/5501-1-avenue.

## Property taxes

- Assessment: $96,604,200
- Market value (city estimate): $214,676,000
- Taxable value: $0
- Assessed land: $1,575,000
- Assessed improvements: $95,029,200

## Tax breaks

- Nonprofit exemption (hospital), with no end date, about $10,479,624 a year below the full tax.

## Zoning

R6: floor area ratio 3.29 built, above the 2.43 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- LUTHERAN MEDICAL CENTER (City Planning P2002K0261): Completed, decided Apr 3, 2003. REVOCABLE CONSENT TO CONSTRUCT A PEDESTRIAN BRIDGE OVER 56TH\*ST BETWEEN 1ST & 2ND AVE TO CONNECT 2 OF THE MEDICAL BLDGS