665A 5th Avenue, Brooklyn
Vacant land · Block 885, Lot 5.
Building permits
- New Building — Multi-Family, filed Jun 25, 2024, 37 units, 6 stories, described as “New 6 story mixed use building.”
- Alteration, filed Jun 10, 2026, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Apr 14, 2026, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 31, 2025, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Feb 25, 2025
- Alteration, filed Aug 27, 2024, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 27, 2024, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 27, 2024, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 27, 2024, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 26, 2024, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 18, 2024, estimated cost $5K, described as “Construction fence in conjunction with demolition and new building applications.”
- Demolition, filed Jun 17, 2024, estimated cost $20K, described as “Full demolition of Existing Four Story Building.”
- Demolition, filed May 23, 2024, estimated cost $20K, described as “Full demolition of Existing three story Building.”
- Demolition, filed May 23, 2024, estimated cost $20K, described as “Full demolition of Existing three Story Building.”
- Alteration, filed Dec 6, 2022, estimated cost $150K, described as “Structural repairs and stabilitzation at existing 3-story mixed use building. As per plan filed herewith. No change to use, egress, and occupancy.”
- Alteration, filed Aug 3, 2022, estimated cost $85K, described as “Filing for general construction work and to obtain a new certificate of occupancy to reflect the two existing dwelling units in the existing IMD building as per plan filed herewith.”
- Alteration, filed Jul 28, 2022, estimated cost $5K, described as “Installation of 300PSF sidewalk shed as per plans. Sidewalk shed shall comply with chapter #33 of the 2014 code, no change in use, egress or occupancy under this application.”
- Alteration, filed Jun 22, 2022, estimated cost $85K, described as “Filing General Construction and structural work to cure the unsafe building condition as per plan filed herewith. No change in use, egress, and occupancy.”
Property taxes
- Assessment
- $47,760
- 2026–27 tax
- $9,477
- Market value (city estimate)
- $796,000
- Taxable value
- $47,760
- Assessed land
- $47,760
Zoning
R6A: floor area ratio 0.00 built, 3.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Feb 20, 2024: $11,400,000
- Jan 13, 2021: $7,850,000
Open-market sales since 2016, from the Department of Finance’s sales files.
In the news
Permits Filed for 240 19th Street in South Slope, Brooklyn, New York YIMBY, Jul 3, 2024.