# 259 21st Street, Brooklyn

Condominium · 37 units · built 2006 · Block 891, Lot 7501.

On Umarelli: https://umarelli.org/nyc/3008917501/259-21-street

More construction in Sunset Park: https://umarelli.org/nyc/brooklyn/sunset-park.md

Every lot on block 891: https://umarelli.org/nyc/brooklyn/891.md

## Building permits

- Alteration, filed Nov 9, 2026, estimated cost $80K, described as “Filing minor interior renovations to Apartment 2A (Lot 1013) at 2nd fl, incl minor non-load bearing partitions and general construction per plans. No change to use/egress/FA/occupancy”
- Alteration, filed Mar 26, 2025, estimated cost $10K, described as “Installation of HVAC split system at Apt 2E as per plans filed. No change in use, egress or occupancy.”
- Alteration, filed Feb 28, 2025, estimated cost $20K, described as “Installation of mini-split system HVAC unit with new condensing unit on the roof. No change in occupancy, use or egress.”
- Alteration, filed Dec 9, 2024, estimated cost $15K, described as “Install replacement boiler as per plans. No change in use, occupancy or egress.”
- Alteration, filed Nov 5, 2024, estimated cost $24K, described as “Installation of four ton (4) mini-split air conditioning system and associated fan coil units. No change to use egress or occupancy under this application.”
- Alteration, filed Aug 5, 2024, estimated cost $5K, described as “Minor parttition work to create third bedroom. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 26, 2024, estimated cost $30K, described as “Inter. Renovation & interior enlargement of existg mezzanine flr. Removal of non-loadbearing partitions & wall, clg & flr finishes. Installation of new non-loadbearing gwb partitions and wall, clg & flr finishes. No proposed change to…”
- Alteration, filed Sep 26, 2023, estimated cost $41K, described as “Installation of 5 ton mini-split air conditioning system and associated piping in apartment 3H. No change in use, egress or occupancy under this application.”
- Alteration, filed Apr 27, 2023, estimated cost $65K, described as “Gas to Gas Direct Replacement of 10 Boilers in boilers room throughout the building in conjunction with BIS Application 301480207”
- Alteration, filed Apr 7, 2023, estimated cost $35K, described as “File to register ten (100 direct vent boilers in the ten (10) different boiler rooms located on the A-side and B-side of the building from the basement through 4th floor”
- Alteration, filed Mar 14, 2023, estimated cost $15K, described as “Plumbing scope of work in-conjunction with general construction interior renovation application. No change to use, egress or occupancy. No enlargement or development.”
- Alteration, filed Dec 12, 2022, estimated cost $75K, described as “Inter. Renov.: removal of gwb, flr, clg & wall finishes & light fixts. Install new gwb, flr, clg &wall finishes. Install replacement light fixts and stair. No proposed change to use, egress or occupancy. No enlargement or development.”
- Alteration, filed Jun 28, 2022, estimated cost $50K, described as “Convert roof to accessory passive recreation. Both common areas and private areas will be created by installing fences. Roof top complies with BB 2018-02.”
- Alteration, filed Jul 13, 2021, estimated cost $5K, described as “Provide new connection to existing sewer piping for new bathrooms. Provide new piping from new electric hot water heater to new bathrooms.”
- Alteration, filed Jul 13, 2021, estimated cost $5K, described as “Mechanical DOB Now application in conjunction with ALteration JOB NO# B00533061-I1”
- Alteration, filed Jun 29, 2021, estimated cost $5K, described as “Structural Scope in Conjunction with Alteration DOB Now JOB NO#B00533061-I1”
- Alteration, filed Jun 24, 2021, estimated cost $56K, described as “Application is filed for the interior renovation and combination of (2) units(3G&3H ) on the 3RD floor into (1) unit (1,882 sf) . No change in use, egress, bulk or occupancy filed under this application.”
- Alteration, filed Jun 3, 2021, described as “Pipe scaffolding installed per plans, no change in use, egress or occupancy”
- Alteration, filed May 25, 2021, described as “Debris chute installed per plans, no change in use, egress or occupancy”
- Alteration, filed Mar 22, 2021, estimated cost $104K, described as “Reduce the size of the exg roof deck to under 20% of roof area. New composite roof decking to be installed. New guard railing to be installed around deck. Existing ramp and stair to be removed and replaced. New rubber play surface to be…”

## Property taxes

- Assessment: $5,705,424
- 2026–27 tax: $493,578
- Market value (city estimate): $12,678,687
- Taxable value: $4,517,810
- Assessed land: $402,304
- Assessed improvements: $5,303,120
- Condo units with their own tax lots: 52

## Tax breaks

- Nonprofit exemption (religious school), with no end date, about $23,159 a year below the full tax.
- Co-op and condo abatement, with no end date, a $67,686 credit this tax year.

## Zoning

R6B: floor area ratio 2.82 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Apr 15, 2026: $1,275,000, Unit BJ
- Mar 25, 2026: $1,325,000, Apt 1C
- Jul 12, 2024: $900,000, Apt 2A
- Jun 21, 2024: $1,430,000, Apt 1A, sold with other lots
- May 8, 2024: $1,900,000, Apt 4J, sold with other lots
- Apr 5, 2024: $1,370,000, Apt 2E
- Aug 1, 2023: $85,000, Apt PS9
- Aug 11, 2022: $1,300,000, Apt 1D
- Jul 13, 2021: $1,195,000, Unit BJ
- Dec 14, 2020: $915,000, Apt 2G

The 10 most recent of 17 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology