## Building permits

- Alteration, filed Jun 15, 2026, estimated cost $495K, described as “Perform required deluge system construction / installation associated with con edison's greenwood substation transformer #4 replacement. There will be 77 water spray nozzles installed in connection with this permit application.”
- Alteration, filed Aug 11, 2025, estimated cost $92K, described as “Modification to existing sprinkler system to offer protection to con edison transformer by adding additional 61 nozzles OSP as per plans filed herewith.”
- Alteration, filed Mar 8, 2024, estimated cost $328K, described as “Installation of new foundations for electrical equipment hf-19, pothead, and breaker 4S/4X lcc pad at con edisons greenwood substation.”
- Alteration, filed Nov 2, 2023, estimated cost $366K, described as “Foundation modification of supports for disc. Switches, bus equipment and feeder termination stand at con edisons greenwood substation.”
- Alteration, filed Jun 26, 2023, estimated cost $709K, described as “Installation and modification of supports and foundations for various disc. Switches, bus sections, ccpd's, breaker equipment at con edisons greenwood substation.”
- Alteration, filed Oct 11, 2022, estimated cost $1.4M, described as “Installation of bus section 6S & 7S equipment, equipment steel supports and foundations at con edisons greenwood substation.”
- Alteration, filed Jun 17, 2022, estimated cost $332K, described as “Install Foundation and Associated Electrical Trough System for Relay Enclosure at Con Edison's Greenwood Substation.”
- Alteration, filed Apr 27, 2022, described as “Installation of temporary stair tower as per plans. No change in use, egress or occupancy.”
- Alteration, filed Apr 26, 2021, estimated cost $250K, described as “Rebuild concrete transformer pad. Grading as shown. Installation of grounding elements for reactor.”
- Alteration, filed Apr 26, 2021, estimated cost $90K, described as “Support of excavation at con edison's greenwood substation as per drawings. Filing in conjunction with structural application #B00463152 on DOB now build. No change in use, egress, and/or occupancy”

## Zoning

R6B (part of the lot is R6A): floor area ratio 0.00 built, 2.00 allowed by base zoning.