# 637 41st Street, Brooklyn

Co-op · 68 units · built c. 1924 · Block 918, Lot 52.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/3009180052/637-41-street

More construction in Sunset Park: https://umarelli.org/nyc/brooklyn/sunset-park.md

Every lot on block 918: https://umarelli.org/nyc/brooklyn/918.md

## Building permits

- Alteration, filed Jun 25, 2026, estimated cost $5K, described as “Interior renovation of existing apartment #3B at third floor level. No change in use, egress and occupancy.”
- Alteration, filed Feb 22, 2024, described as “Renewal of SR22/1245”
- Alteration, filed Feb 21, 2024, described as “Renewal of SR22/1244”
- Alteration, filed Aug 31, 2023, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 10, 2023, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 31, 2023, estimated cost $9K, described as “Structural work filed in conjunction with renovation of apartment 4B on the 4TH floor. Install new steel beam in location of former bearing wall. General construction filed under separate application B07995784-I1.”
- Alteration, filed Mar 30, 2023, estimated cost $15K, described as “Plumbing filed in conjunction with renovation of existing apt 4B on the 4TH floor. Install/replace plumbing fixtures. General construction filed separately under B07995784-I1.”
- Alteration, filed Mar 30, 2023, estimated cost $69K, described as “Renovate existing apartment 4B on the 4TH floor. Demo and construction interior walls, finishes and cabinetry. Plumbing and structural filed separately.”
- Alteration, filed Jan 17, 2023, estimated cost $28K, described as “Install replacement gas booster as per plans. Filing to address ecb violation no. 39071970M. No change in use, egress or occupancy.”
- Alteration, filed Nov 14, 2022, estimated cost $1K, described as “Replace kitchen plumbing fixtures and relocate gas stove in unit #2A on the 2ND floor per layout to supersede the DOB now JOB#B00207907 due to filing issue. No change in use,egress and occupancy.”
- Alteration, filed May 17, 2022, estimated cost $5K, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed May 17, 2022, estimated cost $5K, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application”
- Alteration, filed May 9, 2022, estimated cost $800K, described as “This alteration is being filed to repair existing exterior facade. No change in use egress or occupancy”
- Alteration, filed May 9, 2022, estimated cost $900K, described as “This alteration is being filed to repair existing exterior facade. No change in use egress and occupancy.”
- Alteration, filed Mar 15, 2022, estimated cost $68K, described as “Install 8 washing machines, 4 gas dryers, 2 sprinkler heads and 2" Wilkins DCVA as per plans.”
- Alteration, filed Mar 15, 2022, estimated cost $15K, described as “Install 12" concrete pad and install rigid vent connections as per plans.”
- Alteration, filed Jan 15, 2020, estimated cost $5K, described as “Replace gas stove and kitchen plumbing fixtures in unit #2A on the 2ND floor per layout. No change in use,egress and occupancy.”
- Alteration, filed Sep 4, 2019, estimated cost $1K, described as “Installation of temporary 60' high pipe scaffold originating (off grade) for remedial repair work as per plan. No change in use egress or occupancy,pipe scaffold shall comply with CHAPTER#33 of 2014 the ny building code.”
- Alteration, filed Aug 30, 2019, estimated cost $1K, described as “Installation of temporary 60' high pipe scaffold originating (off grade) for facade repair work as per plan. No change in use egress or occupancy,pipe scaffold shall comply with CHAPTER#33 of 2014 the ny building code.”
- Alteration, filed Aug 30, 2019, estimated cost $1K, described as “Installation of temporary 60' high pipe scaffold originating (off grade) for facade repair work as per plan. No change in use egress or occupancy,pipe scaffold shall comply with CHAPTER#33 of 2014 the ny building code.”
- Alteration, filed Aug 30, 2019, estimated cost $1K, described as “Installation of temporary 60' high pipe scaffold originating (off grade) for remedial repair work as per plan. No change in use egress or occupancy,pipe scaffold shall comply with CHAPTER#33 of 2014 the ny building code.”
- Alteration, filed Aug 30, 2019, estimated cost $1K, described as “Installation of temporary 60' high pipe scaffold originating (off grade) for facade repair work as per plan. No change in use egress or occupancy,pipe scaffold shall comply with CHAPTER#33 of 2014 the ny building code.”

## Property taxes

- Assessment: $2,761,650
- 2026–27 Tax: $219,468
- Market value (city estimate): $6,137,000
- Taxable value: $2,413,171
- Assessed land: $270,450
- Assessed improvements: $2,491,200

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $80,205 credit this tax year.

## Zoning

R6B: floor area ratio 2.56 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Sep 10, 2026: $700,000
- Feb 9, 2024: $525,000
- Jun 28, 2023: $520,000
- Dec 5, 2022: $305,000
- Nov 4, 2022: $525,000
- Jul 27, 2022: $510,000
- Sep 23, 2021: $370,000
- Aug 24, 2021: $465,000
- Apr 23, 2021: $600,000
- Mar 30, 2021: $525,000

The 10 most recent of 30 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
