65 4th Avenue, Brooklyn
Apartment building · 30 units · built 2024 · Block 932, Lot 7.
Building permits
- Alteration, filed Sep 21, 2023, estimated cost $5K, described as “Installation of temporary needle beam as per plans. Needle beam shall comply with the chapter #33 of the code. No changes in use egress or occupancy under this application.”
- Alteration, filed Sep 15, 2023, estimated cost $10K, described as “Installation of horizontal netting as per plans. Horizontal netting shall comply with chapter #33 of the 2014 code, no change in use, egress or occupancy under this application.”
- Alteration, filed Aug 30, 2023, estimated cost $5K, described as “Installation of 300PSF sidewalk shed, overhad protection, and pipe scaffolding as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Feb 16, 2023, estimated cost $16K, described as “Sprinkler and Standpipe filed in conjunction with NB #321592059”
- Alteration, filed Dec 23, 2021, estimated cost $11K, described as “Temporary Standpipe Work Type filed in conjunction with NB#321592059”
- Alteration, filed Oct 25, 2021, estimated cost $7K, described as “Foundation Work Type filed in conjunction with NB#321592059”
- Alteration, filed Oct 25, 2021, estimated cost $6K, described as “SOE work type filed in conjunction with NB#321592059”
- Alteration, filed Oct 25, 2021, estimated cost $8K, described as “Structural Work Type filed in conjunction with NB#321592059”
- Alteration, filed Oct 21, 2021, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Oct 21, 2021, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Oct 21, 2021, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Oct 21, 2021, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Oct 8, 2021, estimated cost $160, described as “Proposed construction fence. No change to use, egress or occupancy under this application.”
- Alteration, filed Oct 8, 2021, estimated cost $160, described as “Proposed construction fence. No change to use, egress or occupancy under this application.”
- Alteration, filed May 3, 2021, estimated cost $15K, described as “Mechanical work type filed in conjunction with NB #321592059”
- Alteration, filed May 3, 2021, estimated cost $22K, described as “Plumbing work type filed in conjunction with NB # 321592059”
Property taxes
- Assessment
- $2,844,900
- 2026–27 tax
- $79,041
- Market value (city estimate)
- $6,322,000
- Taxable value
- $635,432
- Assessed land
- $188,550
- Assessed improvements
- $2,656,350
Tax breaks
- 421-a exemption, through Jun 30, 2059, about $274,836 a year below the full tax.
Zoning
C4-4D: floor area ratio 6.51 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jun 3, 2021: $7,400,000, sold with other lots
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- Gowanus Neighborhood Plan (City Planning 2018K0382): Zoning map change, Zoning text change, City map change, Urban development action area, Completed, decided Dec 6, 2021. The Gowanus Neighborhood Plan is a shared, long-term vision for a thriving neighborhood. It looks to identify strategies for an equitable, resilient and sustainable Gowanus, with more local jobs and housing. The Plan supports community…
In the news
65 4th Avenue Wraps Up Construction in Park Slope, Brooklyn, New York YIMBY, May 28, 2024.