96 Sterling Place, Brooklyn
Apartment building · 25 units · built c. 1911 · Block 945, Lot 19.
Building permits
- Alteration, filed Jun 8, 2026, estimated cost $25K, described as “Modification of existing T-Mobile site. Replace (2) equipment cabinets on an existing platform. Remove (1) cabinet. Replace (3) antennas and (3) RRUs on the roof.”
- Alteration, filed Nov 21, 2024, estimated cost $14K, described as “Filing herewith to relocate existing HVAC along the roof. No change in use, egress or occupancy.”
- Alteration, filed Mar 24, 2021, estimated cost $15K, described as “Install 1 new gas HWH and 2 Water tank at cellar , no change in use, egress or occupancy”
- Alteration, filed Oct 30, 2020, estimated cost $12K, described as “File PL work type in conjunction with OT job# 340780131 at unit 3B, no change in use , egress or occupancy”
- Alteration, filed Oct 30, 2020, estimated cost $5K, described as “File MECH work for unit 3B , in conjunction with OT job# 340780131, no change in use, egress or occupancy”
- Alteration, filed Aug 21, 2020, estimated cost $50K, described as “Add new relieving walls and remove existing walls.Reinforce existing structure with steel framing. new stair openings at 1st fl.”
- Alteration, filed Aug 21, 2020, estimated cost $60K, described as “Mechanical work to renovation of 20 units from 1ST floor to 5TH floor. Work includes to install install new split ac units within apt units and on roof. Ot work filed separately under DOB bis application. No change to use, egress or…”
- Alteration, filed Aug 21, 2020, estimated cost $18K, described as “Mechanical work to renovate apt units 1C, 1D, & 1E from cellar to 1ST floor. Work includes to install install new split ac units within apt units and on roof. No change to use, egress or occupancy. Ot work filed separately under DOB bis…”
- Alteration, filed May 8, 2020, estimated cost $39K, described as “Renovations to units 1c, 1d, &1e from cellar to 1st FL. Work includes new showers, dishwashers, washers & electric dryers, lavs & water closets, relocate & replace existing sinks, lavs & and water closets; remove existing combiboiler”
- Alteration, filed Mar 26, 2020, estimated cost $150K, described as “Renovation of 20 units on the 1st fl through 5th Fl. Includes install new showers, dishwashers, washers and electric dryers, relocate and replace existing lavs, water closets and kitchen sinks.remove existing gas stoves and replace with…”
Property taxes
- Assessment
- $3,048,750
- 2026–27 tax
- $349,667
- Market value (city estimate)
- $6,775,000
- Taxable value
- $2,811,050
- Assessed land
- $117,900
- Assessed improvements
- $2,930,850
Zoning
R6B: floor area ratio 3.60 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jun 27, 2024: $16,750,000
- Nov 17, 2023: $16,500,000
- Dec 20, 2019: $10,400,000, Apt 25
Open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Park Slope Historic District Extension II (Historic District). 7 Landmarks Preservation Commission permits are on file.