323 3rd Avenue, Brooklyn
Utility · Block 968, Lot 1.
Building permits
- Alteration, filed May 11, 2026, estimated cost $10K, described as “Installation of new sidewalk shed at 222 1 street brooklyn ny 11215 as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Jan 5, 2026, described as “Installation of temporary construction fence, heavy duty sidewalk shed, and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Nov 12, 2025, estimated cost $10K, described as “Remove concrete pads in Consolidated Edison of NY Utility yard as per plans . No change to egress occupancy or use involved in this application”
- No Work, filed Oct 22, 2025, described as “Temporary coned employees work space shared with meeting space”
- Alteration, filed Oct 21, 2025, estimated cost $2.2M, described as “Renovation of office space on 1st and 2nd floors of MAIN ADMINISTRATIVE BUILDING as per plans. No change in use, egress, or occupancy.”
- Alteration, filed May 6, 2025, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Demolition, filed Mar 4, 2025, estimated cost $1.5M, described as “Full demolition of one-story con edison garage and attached splice room as per plans.”
- Alteration, filed Apr 25, 2024, estimated cost $2.4M, described as “Repair wall cracks at EAST WALL of Stores Building 1. No change to use egress or occupancy”
- Alteration, filed Mar 22, 2024, estimated cost $185K, described as “Demolish all fire protection & plumbing items at the existing garage building to be demolished. Route service lines to existing adjacent building to remain.”
- Alteration, filed Oct 18, 2023, estimated cost $100K, described as “Mechanical alterations for existing HVAC system for the side coned building as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Oct 18, 2023, estimated cost $900K, described as “Mechanical alterations for existing HVAC system for coned building as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Sep 21, 2023, estimated cost $715K, described as “Replacement of existing H&V Unit with new heat pump energy recovery ventilation unit.”
- Alteration, filed Jun 2, 2023, estimated cost $25K, described as “Installation of mechanical condenser and ahu's and associated ductwork on existing dunnage”
- Alteration, filed Dec 26, 2019, described as “Installation of sidewalk shed as per plans. No change in use, egress or occupancy.”
Zoning
M1-2: floor area ratio 0.00 built, 2.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Gowanus Neighborhood Plan (City Planning 2018K0382): Zoning map change, Zoning text change, City map change, Urban development action area, Completed, decided Dec 6, 2021. The Gowanus Neighborhood Plan is a shared, long-term vision for a thriving neighborhood. It looks to identify strategies for an equitable, resilient and sustainable Gowanus, with more local jobs and housing. The Plan supports community…