235 Prospect Park West, Brooklyn
House of worship · built c. 1910 · Block 1114, Lot 1.
Building permits
- Alteration, filed Sep 4, 2025, estimated cost $22K, described as “Install new chimney liner as per plans. No change to use occupancy or egress.”
- Alteration, filed Jun 19, 2024, estimated cost $10K, described as “Direct replacement of HVAC unit with water-sourced heat pump unit located at grade level.”
- Alteration, filed Aug 2, 2023, estimated cost $5K, described as “Removal of gas meter and associated piping. No change to use, egress or occupancy.”
- Alteration, filed Jul 6, 2023, estimated cost $1K, described as “Filing plans to reflect removal of structural framing. No change to use, egress or occupancy.”
- Alteration, filed Jun 29, 2023, estimated cost $90K, described as “Proposed interior removal works for existing non-bearing partitions & interior finishes only as shown on plans. No change to use, egress or occupancy.”
- Alteration, filed Nov 9, 2022, estimated cost $53K, described as “Facade and roof repairs on the ground floor as indicated on drawings.”
- Alteration, filed Jun 13, 2022, estimated cost $16K, described as “Replace existing gas line from gas meter to boiler. Register two hot water heaters. No change in use, egress or occupancy.”
- Alteration, filed Jun 10, 2022, estimated cost $114K, described as “Replace boiler and burner. No change in use, egress or occupancy.”
- Alteration, filed Jun 10, 2022, estimated cost $40K, described as “Install stainless steel chimney liner in existing chimney. No change in use, egress or occupancy.”
- Alteration, filed Apr 13, 2022, described as “Installation of temporary plywood fence as per plans. No change in use, egress or occupancy.”
- Alteration, filed Apr 13, 2022, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Apr 13, 2022, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Apr 12, 2022, estimated cost $1.2M, described as “Proposed renovation of an existing residential building. Converting into 15 dwelling units and updating egress per plans as an alteration type i.”
- Alteration, filed Feb 10, 2022, estimated cost $10K, described as “Filing herewith plans indicating structural framing”
Property taxes
- Assessment
- $5,037,750
- Market value (city estimate)
- $11,195,000
- Taxable value
- $0
- Assessed land
- $2,492,221
- Assessed improvements
- $2,545,529
Tax breaks
- Nonprofit exemption (house of worship), with no end date, about $546,495 a year below the full tax.
Zoning
R5B: floor area ratio 0.78 built, 1.50 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.