620 Atlantic Avenue, Brooklyn
Public assembly · built 2011 · Block 1118, Lot 1.
Building permits
- Alteration, filed Jul 8, 2026, estimated cost $3K, described as “Installation of a siamese extension to sidewalk barricade as per the filed drawings. No change to use, occupancy or egress.”
- Alteration, filed Jun 26, 2026, estimated cost $1K, described as “Modifications to existing plumbing systems, as per plans.this includes updates to bathrooms and fixtures, a new beverage bar, etc. This scope of work does not contain any modifications to an existing gas system.(box office/flatbush…”
- Alteration, filed May 12, 2026, estimated cost $115K, described as “Sprinkler work as per plans. No change in use, egress or occupancy (Box Office/Flatbush Entry/Lobby)”
- Alteration, filed Apr 15, 2026, estimated cost $9K, described as “Temporary work platform as per drawings. Work platform shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Apr 2, 2026, estimated cost $125K, described as “Removal of mechanical work as per plans. No change in use, egress or occupancy (Box Office/Flatbush Entry/Lobby)”
- Alteration, filed Apr 2, 2026, estimated cost $375K, described as “Removal of interior partitions. No change in use, egress or occupancy (Box Office/Flatbush Entry/Lobby)”
- Alteration, filed Apr 2, 2026, estimated cost $125K, described as “Removal of plumbing work as per plans. No change in use, egress or occupancy (Box Office/Flatbush Entry/Lobby)”
- Alteration, filed Apr 2, 2026, estimated cost $125K, described as “Removal of sprinkler work as per plans. No change in use, egress or occupancy (Box Office/Flatbush Entry/Lobby)”
- Alteration, filed Apr 1, 2026, estimated cost $34K, described as “Installation of sprinkler heads under a temporary construction scaffolding as per the filed plans. No change to use, occupancy or egress.”
- Alteration, filed Apr 1, 2026, estimated cost $5.3M, described as “Removal and installation of interior partitions and finishes as per plans. No change in use, egress or occupancy (Box Office/Flatbush Entry/Lobby)”
- Alteration, filed Apr 1, 2026, estimated cost $2.3M, described as “Removal and installation of interior partitions as per plans. No change in use, egress or occupancy (Baseline Club)”
- Alteration, filed Mar 27, 2026, estimated cost $287K, described as “Structural work for replacement of bollards”
- Alteration, filed Mar 24, 2026, estimated cost $320K, described as “Install temporary trailer to be used while box office under renovation.”
- Alteration, filed Feb 25, 2026, estimated cost $1.1M, described as “Herewith filing for replacement of scoreboard. Work being completed on the 5TH floor construction floor, upper bowl/catwalk, level 8 marketing floor”
- Alteration, filed Feb 18, 2026, estimated cost $203K, described as “4TH floor mez - control room upgrade - removal and installation of non-load bearing partions”
- Alteration, filed Jan 28, 2026, estimated cost $14K, described as “Cellar - installation of two new gas dryers”
- Alteration, filed May 5, 2025, estimated cost $122K, described as “Modification to sprinkler system as per plans.”
- Alteration, filed Mar 31, 2025, estimated cost $305K, described as “Removal and installation of interior partitions and finishes as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 13, 2025, estimated cost $6.6M, described as “Removal and installation of interior partitions and finishes as per plans. No change in use, egress or occupancy.”
- No Work, filed Aug 23, 2024, described as “Angela Yee Day is a free annual outdoor event with scheduled performances for the local community. With free food and beverage. Open to the public with monitored entry”
- No Work, filed Jul 3, 2024, described as “Kids Basketball Camp showcase for parents, exterior plaza, outdoors”
- Alteration, filed Apr 8, 2024, estimated cost $10.0M, described as “Removal and installation of interior partitions and finishes as per plans (Suite Level Work). No change in use, egress or occupancy.”
- Alteration, filed Mar 7, 2024, estimated cost $7K, described as “Installation of temp carbon airframe system w/ LED Panel cladding.no alt to exist structures for Barclay Center Nissan Kicks Auto Reveal. TPA permit not required. Producer is responsible to monitor site safety & implement HWAP.”
- No Work, filed Aug 17, 2023, described as “2023 Angela Yee Day”
- Alteration, filed Apr 26, 2023, estimated cost $50K, described as “(FINI PIZZA) Modification to plumbing fixtures and components as per plans. No change in use, egress or occupancy.”
35 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $1,142,662,050
- Market value (city estimate)
- $2,539,249,000
- Taxable value
- $0
- Assessed land
- $461,496,600
- Assessed improvements
- $681,165,450
Zoning
M1-1 (part of the lot is C4-4A): floor area ratio 2.09 built, above the 1.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- 175 FLATBUSH AVE (City Planning P1984K0826): Completed, decided Oct 25, 1984. DISPOSITION OF CITY-OWNED PROPERTY, 1 PARCEL