# 998-1010 Pacific Street, Brooklyn

Apartment building · 175 units · built 2022 · Block 1133, Lot 32.

On Umarelli: https://umarelli.org/nyc/3011330032/998-1010-pacific-street

More construction in Crown Heights: https://umarelli.org/nyc/brooklyn/crown-heights.md

## Building permits

- Alteration, filed Mar 16, 2022, estimated cost $5K, described as “Installation of pipe scaffolding as per plans. Pipe scaffolding shall comply with chapter #33 of the 2014 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Mar 16, 2022, estimated cost $3K, described as “Installation of temporary needle beam as per plans. Needle beam shall comply with the chapter #33 of the code. No changes in use egress or occupancy under this application.”
- Alteration, filed Dec 21, 2021, estimated cost $5K, described as “Installation of 300psf sidewalk shed and overhead protection as per plans, sidewalk shed shall comply with chapter # 33 of the code 2014, no changes in use, egress and occupancy under this application.”
- Alteration, filed Oct 22, 2021, estimated cost $1K, described as “Installation of roof protection for adjacent property during construction. Roof protection shall comply with nycc 2014 chapter 33 . No change in egress, use, or occupancy.”
- Alteration, filed Oct 12, 2021, estimated cost $1K, described as “Installation of cantilever beam scaffold in accordance with nycc 2014 chapter 33 buliding code. No change in egress, use, or occupancy.”
- Alteration, filed Oct 12, 2021, estimated cost $1K, described as “Installation of single temporary personnel/material hoist for worker access during construction. Single temporary personnel/material hoist complies with chapter 33 of the 2014 NYC building code. No change in use, egress, or occupancy.”
- Alteration, filed Aug 19, 2021, estimated cost $1K, described as “Installation of scaffold for worker access during construction. Scaffold shall comply with nycc 2014 chapter 33 . No change in egress, use, or occupancy.”
- Alteration, filed Aug 5, 2021, estimated cost $1K, described as “Installation and use of temporary material platform as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Apr 26, 2021, estimated cost $1K, described as “Installation of sidewalk shed in accordance with nycc 2014 chapter 33 buliding code. No change in egress, use, or occupancy.”
- Alteration, filed Oct 13, 2020, estimated cost $1K, described as “Temporary air pressurized standpipe system in conjunction with NB # 321590328”
- Alteration, filed Sep 4, 2020, estimated cost $2K, described as “Structural specifications filed in conjunction with NB # 321590328 .”
- Alteration, filed Aug 18, 2020, estimated cost $2K, described as “Installation of new curb cut in conjunction with NB #321590328.”
- Alteration, filed Aug 18, 2020, estimated cost $2K, described as “Combined Sprinkler/Standpipe with Siamese Connection installed on dedicated Fire Sprinkler Service in conjunction with NB # 321590328”
- Alteration, filed Aug 18, 2020, estimated cost $2K, described as “Plumbing specifications filed in conjunction with NB #321590328.”
- Alteration, filed Aug 18, 2020, estimated cost $1.7M, described as “Mechanical Work filed in conjunction with NB 321590328”
- Alteration, filed Feb 14, 2020, described as “Installation of sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Feb 14, 2020, described as “Installation of sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Feb 10, 2020, estimated cost $20K, described as “Proposed to cap and remove sprinkler system. No change to use,egress, or occupancy under this application”
- Alteration, filed Dec 23, 2019, estimated cost $160, described as “Proposed construction fence. No change to use, egress or occupancy under this application. NB job # 321590328”

## Property taxes

- Assessment: $17,698,500
- 2026–27 tax: $87,792
- Market value (city estimate): $39,330,000
- Taxable value: $705,780
- Assessed land: $1,164,150
- Assessed improvements: $16,534,350

## Tax breaks

- 421-a exemption, through Jun 30, 2058, about $2,113,724 a year below the full tax.

## Zoning

M1-2A/R6A: floor area ratio 6.38 built, above the 3.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Nov 8, 2019: $20,250,000, sold with other lots

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- AAMUP Follow Up Action (City Planning 2025K0404): Zoning text change, Completed, filed Jun 25, 2025, decided Nov 12, 2025. A zoning text amendment by the Department of City Planning (DCP) to the Special Atlantic Avenue Mixed Use District to limit a portion of a mid-block non-residential use incentive in M1-2A/R6A areas to light industrial and certain community…
- Atlantic Avenue Mixed-Use Plan (City Planning 2022K0436): Zoning map change, Zoning text change, City property acquisition, Urban development action area, Completed, filed Oct 10, 2024, decided May 28, 2025. The Atlantic Avenue Mixed-Use Plan is an area-wide plan to support housing and job growth along Atlantic Avenue between Vanderbilt Avenue and Nostrand Avenue in Community Districts 3 and 8 within the neighborhoods of Crown Heights, Bedford…
- 1010 Pacific Street Rezoning (City Planning P2015K0351): Completed, decided Jun 5, 2019. This is a private application by 1010 Pacific Street LLC requesting a zoning map amendment from M1-1 to R7D/C2-4 and a zoning text amendment to designate an MIH area to facilitate a new 11-story mixed use development with 154 dwelling…

## In the news

[Housing Lottery Launches for 1010 Pacific Street in Crown Heights, Brooklyn](https://newyorkyimby.com/2023/01/housing-lottery-launches-for-1010-pacific-street-in-crown-heights-brooklyn.html), New York YIMBY, Jan 21, 2023.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
