# 971 Dean Street, Brooklyn

Commercial · built c. 1930 · Block 1134, Lot 81.

On Umarelli: https://umarelli.org/nyc/3011340081/1070-pacific-street

More construction in Crown Heights: https://umarelli.org/nyc/brooklyn/crown-heights.md

## Building permits

- New Building — Mid-Rise, filed Apr 29, 2026, 64 units, 11 stories, described as “(please assign to dev hub, it should be assigned to same examiner as job B01390326-I1 and B01390458-I1 as its same zoning lot with same scope of work, applicant and owner) PROPOSED NEW 11 STORY AND CELLAR 64 UNIT MIXED USE BUILDING”
- New Building — Mid-Rise, filed Apr 29, 2026, 82 units, 11 stories, described as “(please assign to dev hub, it should be assigned to same examiner as job B01390460-I1 and B01390326-I1 as its same zoning lot with same scope of work, applicant and owner) PROPOSED NEW 11 STORY AND CELLAR 82 UNIT MIXED USE BUILDING”
- New Building — Mid-Rise, filed Apr 29, 2026, 82 units, 11 stories, described as “(Please assign to dev hub, it should be assigned to same examiner as job B01390460-I1 and B01390458-I1 as its same zoning lot with same scope of work, applicant and owner) PROPOSED NEW 11 STORY AND CELLAR 82 UNIT MIXED USE BUILDING”
- Alteration, filed Oct 21, 2026, estimated cost $160, described as “Proposed 8FT construction fence. No change to use, egress or occupancy under this application.”
- Demolition, filed Sep 2, 2026, estimated cost $70K, described as “Full demolition to a two story building”
- Demolition, filed Sep 2, 2026, estimated cost $70K, described as “Full demolition to a two story building”
- Demolition, filed Sep 2, 2026, estimated cost $70K, described as “Full demolition to a two story building”
- Demolition, filed Jan 28, 2026, estimated cost $70K, described as “Full demolition to a two story building”
- Alteration, filed Jan 28, 2026, described as “Installation of temporary plywood fence as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jan 14, 2026, described as “Installation of temporary plywood fence as per plans. No change in use, egress or occupancy.”
- Alteration, filed Oct 7, 2025, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Major Renovation — Enlargement, filed Jun 19, 2023, estimated cost $100K, 3 units added, 3 stories, described as “2 story addition over existing 1 story commercial old code building. Relocation of (3) existing IMD tenants to altered building. Loft Board approval required. New Certificate of Occupancy showing residential use.”

## Property taxes

- Assessment: $1,517,400
- 2026–27 tax: $148,323
- Market value (city estimate): $3,372,000
- Taxable value: $1,367,280
- Assessed land: $338,400
- Assessed improvements: $1,179,000

## Zoning

M1-2A/R6A: floor area ratio 0.83 built, 3.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- AAMUP Follow Up Action (City Planning 2025K0404): Zoning text change, Completed, filed Jun 25, 2025, decided Nov 12, 2025. A zoning text amendment by the Department of City Planning (DCP) to the Special Atlantic Avenue Mixed Use District to limit a portion of a mid-block non-residential use incentive in M1-2A/R6A areas to light industrial and certain community…
- Atlantic Avenue Mixed-Use Plan (City Planning 2022K0436): Zoning map change, Zoning text change, City property acquisition, Urban development action area, Completed, filed Oct 10, 2024, decided May 28, 2025. The Atlantic Avenue Mixed-Use Plan is an area-wide plan to support housing and job growth along Atlantic Avenue between Vanderbilt Avenue and Nostrand Avenue in Community Districts 3 and 8 within the neighborhoods of Crown Heights, Bedford…

## In the news

[Permits Filed for 1070 Pacific Street in Crown Heights, Brooklyn](https://newyorkyimby.com/2026/05/permits-filed-for-1070-pacific-street-in-crown-heights-brooklyn.html), New York YIMBY, May 23, 2026.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
