649 Washington Avenue, Brooklyn
Condominium · 16 units · built 2007 · Block 1147, Lot 7501.
Building permits
- Alteration, filed Apr 17, 2025, estimated cost $250K, described as “Herewith filing for facade repair as per the drawings. No change in use, egress or occupancy.”
- Alteration, filed Apr 17, 2025, estimated cost $250K, described as “Herewith filing for Facade repair as per the drawings. No change in use, egress or occupancy.”
- Alteration, filed Apr 15, 2025, described as “Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.”
- Alteration, filed Apr 15, 2025, described as “Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.”
- Alteration, filed Mar 19, 2024, described as “Installation of a suspended scaffold for facade inspection and repair as per the plans submitted. No change to egress or occupancy.”
- Alteration, filed Oct 16, 2023, estimated cost $3K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapte r 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 16, 2023, estimated cost $3K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Sep 19, 2023, estimated cost $3K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Sep 19, 2023, estimated cost $3K, described as “Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application”
- Alteration, filed Jun 29, 2023, estimated cost $774K, described as “Partial facade restorationand waterproofing”
- Alteration, filed Jun 29, 2023, estimated cost $774K, described as “Partial facade restorationand waterproofing”
Property taxes
- Assessment
- $2,861,999
- 2026–27 tax
- $3,359
- Market value (city estimate)
- $6,360,004
- Taxable value
- $27,002
- Assessed land
- $161,548
- Assessed improvements
- $2,700,451
- Condo units with their own tax lots
- 16
Tax breaks
- 421-a exemption, through Jun 30, 2033, about $352,645 a year below the full tax.
Zoning
R6A (part of the lot is R6B): floor area ratio 3.76 built, above the 3.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Feb 3, 2025: $400,000, Apt 1C
- Nov 21, 2023: $1,695,000, Apt 2A
Open-market sales since 2016, from the Department of Finance’s sales files.