# 649 Washington Avenue, Brooklyn

Condominium · 16 units · built 2007 · Block 1147, Lot 7501.

On Umarelli: https://umarelli.org/nyc/3011477501/649-washington-avenue

More construction in Crown Heights: https://umarelli.org/nyc/brooklyn/crown-heights.md

Every lot on block 1147: https://umarelli.org/nyc/brooklyn/1147.md

## Building permits

- Alteration, filed Apr 17, 2025, estimated cost $250K, described as “Herewith filing for facade repair as per the drawings. No change in use, egress or occupancy.”
- Alteration, filed Apr 17, 2025, estimated cost $250K, described as “Herewith filing for Facade repair as per the drawings. No change in use, egress or occupancy.”
- Alteration, filed Apr 15, 2025, described as “Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.”
- Alteration, filed Apr 15, 2025, described as “Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.”
- Alteration, filed Mar 19, 2024, described as “Installation of a suspended scaffold for facade inspection and repair as per the plans submitted. No change to egress or occupancy.”
- Alteration, filed Oct 16, 2023, estimated cost $3K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapte r 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 16, 2023, estimated cost $3K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Sep 19, 2023, estimated cost $3K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Sep 19, 2023, estimated cost $3K, described as “Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application”
- Alteration, filed Jun 29, 2023, estimated cost $774K, described as “Partial facade restorationand waterproofing”
- Alteration, filed Jun 29, 2023, estimated cost $774K, described as “Partial facade restorationand waterproofing”

## Property taxes

- Assessment: $2,861,999
- 2026–27 Tax: $3,359
- Market value (city estimate): $6,360,004
- Taxable value: $27,002
- Assessed land: $161,548
- Assessed improvements: $2,700,451
- Condo units with their own tax lots: 16

## Tax breaks

- 421-a exemption, through Jun 30, 2033, about $352,645 a year below the full tax.

## Zoning

R6A (part of the lot is R6B): floor area ratio 3.76 built, above the 3.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Feb 3, 2025: $400,000, Apt 1C
- Nov 21, 2023: $1,695,000, Apt 2A

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
