# 296 Sterling Place, Brooklyn

Co-op · 22 units · built c. 1910 · Block 1170, Lot 29.

On Umarelli: https://umarelli.org/nyc/3011700029/296-sterling-place

Every lot on block 1170: https://umarelli.org/nyc/brooklyn/1170.md

## Building permits

- Alteration, filed Apr 22, 2024, estimated cost $6K, described as “Replacing bathroom fixtures and relocating one sink.”
- Alteration, filed Mar 1, 2024
- Alteration, filed Feb 16, 2024, estimated cost $74K, described as “Renovation of existing unit #15. Remove and construct partitions. Plumbing to be filed under separate application. No change in use, egress or occupancy.”
- Alteration, filed Feb 16, 2024, estimated cost $7K, described as “Plumbing work associated with (ot) job # B00997680. Relocation of 5 fixtures and 3 new fixtures for bathrooms and kitchen.”
- Alteration, filed Apr 1, 2023, estimated cost $40K, described as “Bathroom expansion including new finishes and plumbing fixtures. Demolition of a non bearing wall. Installation of a new non bearing wall, relocation of the bathroom sink.”
- Alteration, filed Oct 5, 2022, estimated cost $2K, described as “Installation of barricades with chain link fence as per plans. All equipment shall comply with chapter #33 of the 2014 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Jun 15, 2022, estimated cost $8K, described as “Propose plumbing work in conjunction with arch. Design. No change in use, egress, or occupancy.”
- Alteration, filed Jun 6, 2022, estimated cost $9K, described as “Propose mechanical work for apartment #2A for renovation in conjunction with gc filing # B00730348. No change in use, egress, or occupancy.”
- Alteration, filed Jun 6, 2022, estimated cost $10K, described as “Propose structural work in conjunction with arch. Design. No change in use, egress, or occupancy.”
- Alteration, filed Jun 5, 2022, estimated cost $80K, described as “Propose to combine apartments pursuant TPPN#3/97 for existing dwelling cellar & 1ST fl with interior renovations work includes minor partitions & finish work as per plan. No change in use, egress, & occupancy.”
- Alteration, filed Mar 23, 2022, estimated cost $8K, described as “Propose support of excavation works for retain wall replacement at rear yard as per plan in conjunction with gc & fo applications filed under GC#B00687087 and FO#B00694525.”
- Alteration, filed Mar 23, 2022, estimated cost $5K, described as “Propose foundation works for retaining wall replacement as per plan in conjunction with gc & soe application filed under GC#B00687087 and SOE#B00694529. No change in use, egress, and occupancy.”
- Alteration, filed Mar 17, 2022, estimated cost $135K, described as “Propose new site works on rear yard include replacement of damaged retaining wall, new exterior stair, guard railing, fence, new non-structural concrete slab as per plan. No work to the existing building. No change in use, egress, or…”

## Property taxes

- Assessment: $2,796,750
- 2026–27 tax: $236,349
- Market value (city estimate): $6,215,000
- Taxable value: $2,219,865
- Assessed land: $170,100
- Assessed improvements: $2,626,650

## Tax breaks

- Co-op and condo abatement, with no end date, a $39,583 credit this tax year.

## Zoning

R8X: floor area ratio 4.33 built, 6.02 allowed by base zoning.

## Recent sales

- Jul 30, 2026: $56,000
- Jul 30, 2026: $55,000
- Jul 27, 2026: $2,535,000
- Jul 8, 2021: $1,450,000
- Mar 3, 2021: $690,000
- Feb 26, 2021: $1,450,000
- Jun 18, 2020: $525,000, Apt 3
- Jun 10, 2019: $534,000
- May 16, 2019: $1,950,000
- Sep 14, 2017: $545,000

The 10 most recent of 12 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
