# 135 Eastern Parkway, Brooklyn

Co-op · 186 units · built c. 1926 · Block 1179, Lot 47.

On Umarelli: https://umarelli.org/nyc/3011790047/135-eastern-parkway

Every lot on block 1179: https://umarelli.org/nyc/brooklyn/1179.md

## Building permits

- Alteration, filed Aug 10, 2021, estimated cost $50K, described as “Minor renovation of apartment #10I kitchen and powder room. Work includes the removal of a portion of non-load bearing partition and the erection of new non-load bearing partitions, door and finishes as per plans. No change to use,…”
- Alteration, filed Jun 28, 2021, estimated cost $310K, described as “Filing herewith application for plumbing fixtures, piping, and riser replacement on 1-15 floors, and cellar. No change in use, egress or occupancy.”
- Alteration, filed Jun 25, 2021, estimated cost $880K, described as “General construction work associated with replacing plumbing lines in the b line units”
- Alteration, filed Nov 6, 2020, estimated cost $4K, described as “Replace and install new pl fixtures in apt# 4K on 4TH floor. All as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 5, 2020, estimated cost $29K, described as “Filing application for plumbing work in apartment 14J/14K on the 14TH floor. No change in use, egress or occupancy.”
- Alteration, filed Jul 31, 2020, estimated cost $310K, described as “Fixtures, branch line piping, and riser replacement on floors 1-15, as well as cellar. New gas riser from cellar to 15th floor, with individual gas meters connected to a common gas meter in cellar level. New gas branch lines to be…”
- Alteration, filed Apr 24, 2020, estimated cost $7K, described as “Renovation of 2 existing bathrooms in APT#15A. Replace 1 toilet, 1 lav & 1 tub. 1 new shower, relocate 1 toilet & 1 lav. All in conjunction with approved application #322083516”
- Alteration, filed Mar 9, 2020, estimated cost $15K, described as “Filing for demolition and removal of items as required, install duct work and duct work accessories, install air distribution system (air outlets, fan powered boxes). No change in use, egress, or occupancy.”
- Alteration, filed Mar 9, 2020, estimated cost $32K, described as “Filing for interior plumbing in conjunction with apartment renovation application under job #. No change to use, egress, or occupancy.”
- Alteration, filed Oct 25, 2019, estimated cost $310K, described as “Filing herewith application for plumbing fixtures, piping, and riser replacement on 1-15 floors, and cellar. No change in use, egress or occupancy.”
- Alteration, filed Oct 10, 2019, estimated cost $12K, described as “Installation of (2) plumbing fixture,replacing/relocating(4) fixtures and removing(1) no change in egress, use or occupancy”
- Alteration, filed Sep 16, 2019, estimated cost $26K, described as “Renovation of Bathrooms replacing, relocating, and removing plumbing fixtures as shown on plan. No change in use, egress, or occupancy.”

## Property taxes

- Assessment: $16,211,700
- 2026–27 tax: $1,588,818
- Market value (city estimate): $36,026,000
- Taxable value: $15,077,818
- Assessed land: $1,039,950
- Assessed improvements: $15,171,750

## Tax breaks

- Co-op and condo abatement, with no end date, a $288,466 credit this tax year.

## Zoning

R8X: floor area ratio 6.19 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Jul 16, 2026: $2,551,000
- May 26, 2026: $1,100,000
- Apr 6, 2026: $1,694,000
- Mar 4, 2026: $1,405,000
- Oct 6, 2025: $2,270,000
- Jul 29, 2025: $1,050,000
- Jan 28, 2025: $1,850,000
- Oct 21, 2024: $390,000
- Sep 17, 2024: $2,375,000
- Aug 14, 2024: $2,200,000

The 10 most recent of 77 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
