925 Carroll Street, Brooklyn
Public school · built c. 1925 · Block 1188, Lot 1.
Building permits
- Alteration, filed Oct 11, 2026, estimated cost $40K, described as “Filing for temporary construction fence in conjunction with B01322344. No change in use, egress or occupancy.”
- Alteration, filed Oct 11, 2026, estimated cost $60K, described as “Filing for temporary sidewalk shed in conjunction with B01322344. No change in use, egress or occupancy.”
- Alteration, filed Oct 11, 2026, estimated cost $70K, described as “Filing for temporary supported scaffolding in conjunction with B01322344. No change in use, egress or occupancy.”
- Alteration, filed Jul 22, 2026, estimated cost $40K, described as “File mechanical work to install (2)two HVAC units at 1ST floor court yard for gym of public school K600. No change in use, egress, or occupancy.”
- No Work, filed May 18, 2026, described as “One day festival”
- Alteration, filed Feb 19, 2026, estimated cost $32.0M, described as “K600 : Remove and Replace As-Built Roofing including parapet walls; Remove, replace, Point, Seal, Caulk Brick and Masonry Work, replace Doors & Windows, Miscellaneous Interior and Exterior Work as per Plan.”
- Alteration, filed Dec 22, 2025, estimated cost $755K, described as “Installation of photovoltaic solar array on roof including all related structural work as per plans filed herewith. No changeto use, egress or occupancy.”
- Alteration, filed Mar 24, 2025, estimated cost $500K, described as “New Burner Installation, Combustion Air Fan, Room Temperature Control, Boilers Safety Devices and Controls. Installation of Duct Detectors in Mechanical Room Area Open to Boiler Room.”
- Alteration, filed Jun 27, 2024, estimated cost $500K, described as “Burner Installation, combustion air fan, air dilution, exhaust air and boilers safety devices and controls. Oil system cleaning and other GC Scope.”
- Alteration, filed Dec 18, 2023, estimated cost $250K, described as “Removal of existing breeching and installation of new breeching and stainless steel liner system”
- Alteration, filed Jun 7, 2023, estimated cost $20K, described as “File mechanical work to install (2)two HVAC units at 1ST floor court yard for public school K600. No change in use, egress, or occupancy.”
- Alteration, filed Jun 7, 2023, estimated cost $20K, described as “File mechanical work to install (2)two HVAC units at 1ST floor court yard for public school K600. No change in use, egress, or occupancy.”
- Alteration, filed Dec 16, 2022, estimated cost $2K, described as “K600 (POT) - Removal of portion of glazed tile and with new replace tile finish surrounding water fountains.”
- Alteration, filed Oct 6, 2022, estimated cost $743K, described as “K600 - LPN Removal of all lockers, wall boards, molding drywall, dropped ceiling, VCT flooring.”
- Alteration, filed Jan 6, 2022, estimated cost $20K, described as “Installation of temporary construction fence for ps 241K mini at 925 carroll street, brooklyn as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
Property taxes
- Assessment
- $18,706,950
- Market value (city estimate)
- $41,571,000
- Taxable value
- $0
- Assessed land
- $2,259,000
- Assessed improvements
- $16,447,950
Zoning
R8A: floor area ratio 2.51 built, 6.02 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.